Back to kitchen remodel contractors
Alpha Construction & Engineering Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Mar 2018
- Last 24 months
- 0 permits filed
74 permits since 2000: 66 completed, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 17 completed, 1 expired or cancelled. Typically 6 days from filing to permit and 322 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2016 | Completed final sign-off Jul 2017 | 1440 15th Av | replace (e) int stairs bet 1st & 2nd flr. (n) powder rm, kitchen remdoel @ 2nd flr; remodel (e) bath & (n) bath + (n) laundry @ 3rd flr; convert (e) storage into habitable space w/1 bedrm, 1 bath & 1 den @ 1st flr; remove stairs at rear yard, new deck & stairs at rear yard.Details
replace (e) int stairs bet 1st & 2nd flr. (n) powder rm, kitchen remdoel @ 2nd flr; remodel (e) bath & (n) bath + (n) laundry @ 3rd flr; convert (e) storage into habitable space w/1 bedrm, 1 bath & 1 den @ 1st flr; remove stairs at rear yard, new deck & stairs at rear yard. | $110,000 |
| Dec 23, 2015 | Completed final sign-off Nov 2017 | 1573 10th Av | revision to approved permit app #201510200217 includes rear horiz. addition at 1/f & 2/f. new deck at 2/f & 3/f; additional laundry being added at 1/f. addition allows for a larger kitchen at 2/f & bedrm & larger family rm at 1/f.Details
revision to approved permit app #201510200217 includes rear horiz. addition at 1/f & 2/f. new deck at 2/f & 3/f; additional laundry being added at 1/f. addition allows for a larger kitchen at 2/f & bedrm & larger family rm at 1/f. | $60,000 |
| Oct 28, 2015 | Completed final sign-off Feb 2017 | 342 23rd Av | at first flr: convert storage & garage into new bedroom, den, bath. replace (e) stairs between 1st & 2nd flrs. 2nd floor: new opening between kitchen & dining, remodel bathroomDetails
at first flr: convert storage & garage into new bedroom, den, bath. replace (e) stairs between 1st & 2nd flrs. 2nd floor: new opening between kitchen & dining, remodel bathroom | $38,000 |
| Oct 20, 2015 | Completed final sign-off Nov 2017 | 1573 10th Av | interior remodel with rooms downstairs. remodel (e) kitchen & bathrooms. garage door is widened & front stairs shortened. front windows replaced in kind. new bathrooms at 1st, 2nd and 3rd floorsDetails
interior remodel with rooms downstairs. remodel (e) kitchen & bathrooms. garage door is widened & front stairs shortened. front windows replaced in kind. new bathrooms at 1st, 2nd and 3rd floors | $70,000 |
| Mar 20, 2015 | Completed final sign-off Feb 2016 | 1291 Arguello Bl | convert storage space to habitable @ basement. new bath, bed and laundry. replace interior stairs connecting 1st to 2nd. new deck & stairs. remodel kitchen add powder room @ 2nd flr, remodel & add 1 bath to 3rd flr.Details
convert storage space to habitable @ basement. new bath, bed and laundry. replace interior stairs connecting 1st to 2nd. new deck & stairs. remodel kitchen add powder room @ 2nd flr, remodel & add 1 bath to 3rd flr. | $90,000 |
| Jan 20, 2015 | Completed final sign-off Jul 2016 | 19 Kenwood Wy | interior remodel of all 2 floors, new kitchen (remodel), additinal 2 bathrooms & 2 bedrooms @ 1st floor.Details
interior remodel of all 2 floors, new kitchen (remodel), additinal 2 bathrooms & 2 bedrooms @ 1st floor. | $150,000 |
| Dec 17, 2013 | Completed final sign-off Jun 2017 | 19 Arago St | remodel existing kitchen & adding 1/2 bathroom at 2nd floor. new rooms, family room & bathroom at ground floor. replace existing fundation at the rear wall only.Details
remodel existing kitchen & adding 1/2 bathroom at 2nd floor. new rooms, family room & bathroom at ground floor. replace existing fundation at the rear wall only. | $25,000 |
| Apr 18, 2013 | Completed final sign-off Sep 2014 | 601 Broderick St | exploratory work @ walls & floors (5%), repair in kind, floor, bath & kitchen - demo cabibets, fixtures only)Details
exploratory work @ walls & floors (5%), repair in kind, floor, bath & kitchen - demo cabibets, fixtures only) | $15,000 |
| Dec 31, 2012 | Completed final sign-off May 2013 | 306 Thornton Av | remodel (e) kitchen & full bathroom at 2nd floor. re-slab flooring at ground level. no habitable space at ground floorDetails
remodel (e) kitchen & full bathroom at 2nd floor. re-slab flooring at ground level. no habitable space at ground floor | $38,000 |
| Dec 11, 2012 | Completed final sign-off Sep 2014 | 601 Broderick St | revert to sfd int remol: basement, add bath, rec rm, garage. 1st fl(n)kitchen, living rm, half bath, dining rm. 2nd fl (n)bedrms, baths & roof deck. 3rd fl: (n)office, bath & playrm. all perimeter foundation & walls were completed under seperate permit 201208308598 & 201211083819. remove (e)curbDetails
revert to sfd int remol: basement, add bath, rec rm, garage. 1st fl(n)kitchen, living rm, half bath, dining rm. 2nd fl (n)bedrms, baths & roof deck. 3rd fl: (n)office, bath & playrm. all perimeter foundation & walls were completed under seperate permit 201208308598 & 201211083819. remove (e)curb | $350,000 |
| Dec 10, 2012 | Completed final sign-off Jul 2015 | 251 Missouri St | to comply w/ complaints #200121258 & #199812166 reconfig front stair. excavate behind garage & @ rear yard to create lower unit living space. claim attic as upper unit living space. infill portion @facade btwn bay & entry portico. reshape rear roof @ attic level. remodel(e)units. (2)kitchen,(6)bath,Details
to comply w/ complaints #200121258 & #199812166 reconfig front stair. excavate behind garage & @ rear yard to create lower unit living space. claim attic as upper unit living space. infill portion @facade btwn bay & entry portico. reshape rear roof @ attic level. remodel(e)units. (2)kitchen,(6)bath, | $350,000 |
| Apr 6, 2012 | Completed final sign-off Feb 2013 | 152 26th Av | full remodel. lower level:northern lightwell infill at upper floor. garage door to be moved forward. 2nd level: remodel bath, kitchen and bedrooms. new stair to lower level. 3rd level: new bath, remodel bath, 3 bedrooms. seismic upgrade and new beams throughout per structural plans.Details
full remodel. lower level:northern lightwell infill at upper floor. garage door to be moved forward. 2nd level: remodel bath, kitchen and bedrooms. new stair to lower level. 3rd level: new bath, remodel bath, 3 bedrooms. seismic upgrade and new beams throughout per structural plans. | $150,000 |
| Apr 7, 2011 | Completed final sign-off Dec 2011 | 121 Beulah St | interior remodel of (e) bathrm & kitchen, add 1 full bathrm, 1 powder rm on 2nd fl. condition lower level spaces behind garage w/new bathrm, laundry, bedrm, & living rm. condition attic, install new stairs, 1 bathrm, 2 bedrms, furnace, water heater. 5 new dormers, 5 new skylights, remove sunrm @Details
interior remodel of (e) bathrm & kitchen, add 1 full bathrm, 1 powder rm on 2nd fl. condition lower level spaces behind garage w/new bathrm, laundry, bedrm, & living rm. condition attic, install new stairs, 1 bathrm, 2 bedrms, furnace, water heater. 5 new dormers, 5 new skylights, remove sunrm @ | $180,000 |
| Dec 21, 2010 | Completed final sign-off Sep 2011 | 3281 Jackson St | remodel kitchen, pantry, sitting room to new family rm & kitchen, remodel 1 bathrm & add 1 new full bathrm, remodel master bedrm/bathrm suite, add new central heating to 3rd fl in lieu of baseboard heaters.Details
remodel kitchen, pantry, sitting room to new family rm & kitchen, remodel 1 bathrm & add 1 new full bathrm, remodel master bedrm/bathrm suite, add new central heating to 3rd fl in lieu of baseboard heaters. | $148,000 |
| Dec 6, 2010 | Expired or cancelled expired Jun 2014 | 961 Union St | beam repair/strengthening at front bay cantilevered bay windows interior bath & kitchen remodel in all four units.Details
beam repair/strengthening at front bay cantilevered bay windows interior bath & kitchen remodel in all four units. | $160,000 |
| Jun 25, 2010 | Completed final sign-off Sep 2010 | 1875 26th Av | 1) kitchen remodelDetails
1) kitchen remodel | $10,000 |
| Apr 28, 2009 | Completed final sign-off Feb 2010 | 1501 34th Av | remodel existing space on 1st floor: entertainment room, bathroom, laundry area & 2 bedrooms. midlevel combine existing bedroom & bath to become a study room, 2nd floor: widen & remodel kitchen by relocating a wall.Details
remodel existing space on 1st floor: entertainment room, bathroom, laundry area & 2 bedrooms. midlevel combine existing bedroom & bath to become a study room, 2nd floor: widen & remodel kitchen by relocating a wall. | $95,000 |
| Dec 29, 2008 | Completed final sign-off Feb 2009 | 226 Raymond Av | remove illegal kitchens in existing ground fl & 2nd fl to respond nov #200838870, legalize one full bathroom & laundry room on existing ground fl per plan.Details
remove illegal kitchens in existing ground fl & 2nd fl to respond nov #200838870, legalize one full bathroom & laundry room on existing ground fl per plan. | $12,000 |