Back to kitchen remodel contractors
Alpha Construction Company
- Based in
- El Cerrito
- On San Francisco permits
- Jul 2012 to Jul 2023
- Last 24 months
- 0 permits filed
52 permits since 2000: 36 completed, 12 never finaled, 4 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 10 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 8 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 207 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2021 | Never finaled issued Feb 2021, no final | 119 Otsego Av | remodel kitchen & one bathroomDetails
remodel kitchen & one bathroom | $25,000 |
| Aug 4, 2020 | Completed final sign-off Jun 2021 | 105 Foote Av | renovate(e) ground floor, including, 2 bedrooms, one full bath & a recreation room. remove (e) interior stair from 2nd fl to ground fl. remodel kitchen, bath on 2nd floor.Details
renovate(e) ground floor, including, 2 bedrooms, one full bath & a recreation room. remove (e) interior stair from 2nd fl to ground fl. remodel kitchen, bath on 2nd floor. | $60,000 |
| Jul 31, 2020 | Completed final sign-off Sep 2021 | 26 Prescott Ct | apt a:kitchen remodel, cabinets,flooring,tile, 80 sfDetails
apt a:kitchen remodel, cabinets,flooring,tile, 80 sf | $15,000 |
| Feb 18, 2020 | Completed final sign-off Mar 2021 | 1177 California St | unit #1023: kitchen and bathroom remodel in kindDetails
unit #1023: kitchen and bathroom remodel in kind | $25,000 |
| Nov 6, 2019 | Completed final sign-off Jun 2020 | 1421 Dolores St | remodel three bathroom (tiles, flooring, painting, shower pan) remodel one kitchen ( cabinet, tile flooring, island) non structural.Details
remodel three bathroom (tiles, flooring, painting, shower pan) remodel one kitchen ( cabinet, tile flooring, island) non structural. | $35,000 |
| Oct 21, 2019 | Completed final sign-off Dec 2019 | 27 Walter St | basement unit, remodel 1 kitchen & 1 bathroom. cabinets, tiling, new fan. no wall removal.Details
basement unit, remodel 1 kitchen & 1 bathroom. cabinets, tiling, new fan. no wall removal. | $12,000 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 401 Rolph St | remodel kitchen (upgrading electrical and plumbing)Details
remodel kitchen (upgrading electrical and plumbing) | $15,000 |
| Feb 20, 2019 | Expired or cancelled expired Dec 2021 | 26 Mercury St | 1st flr - ad media room and office, 1 full bathroom and family room. 2nd flr - remodel kitchen and bathDetails
1st flr - ad media room and office, 1 full bathroom and family room. 2nd flr - remodel kitchen and bath | $80,000 |
| Dec 11, 2018 | Never finaled issued Dec 2018, no final | 321 Foerster St | remodel upper kitchen (upgrade subpanel, add recessed lights, cabinet tiles) 210 sf. remodel upper bathroom (install tiles & vanity) 40 sf.Details
remodel upper kitchen (upgrade subpanel, add recessed lights, cabinet tiles) 210 sf. remodel upper bathroom (install tiles & vanity) 40 sf. | $17,000 |
| Oct 1, 2018 | Completed final sign-off Apr 2024 | 340 Jersey St | 1 story vertical addition & horizontal addition. 1st fl: add media, (1) bedroom, (1) full bath, (1) laundry & mudroom. 2nd fl: total remodel of kitchen, dining, living, pantry & half bath. 3rd fl: add (3) bedrooms, (3) full baths, (1) office, laundry, & roof deck.Details
1 story vertical addition & horizontal addition. 1st fl: add media, (1) bedroom, (1) full bath, (1) laundry & mudroom. 2nd fl: total remodel of kitchen, dining, living, pantry & half bath. 3rd fl: add (3) bedrooms, (3) full baths, (1) office, laundry, & roof deck. | $200,000 |
| Aug 10, 2018 | Completed final sign-off Dec 2018 | 2527 Moraga St | kitchen remodel: work to include granite, cabinet & tile. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3.Details
kitchen remodel: work to include granite, cabinet & tile. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3. | $11,000 |
| Sep 10, 2013 | Completed final sign-off Sep 2013 | 1010 Bush St | replace 1 new window @ kitchen area. only side of building. #1010 common area @ first floor. to comply with his nov#201310411 dated 8/20/2013.Details
replace 1 new window @ kitchen area. only side of building. #1010 common area @ first floor. to comply with his nov#201310411 dated 8/20/2013. | $300 |