Back to kitchen remodel contractors
Alonzo Mcshane Construction
- Based in
- Pinole
- On San Francisco permits
- Apr 2023 to Apr 2023
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 66 days from filing to permit and 280 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2023 | Completed final sign-off Mar 2024 | 2045 Quesada Av | legalize & repair (e) storage room by water damage. convert closet to powder room under staircase & install kitchenette at playroom at g/f. repair (e) deck at rear in-kind (less than 50%) & remove un-permitted cover above deck, convert back to (e) condition at 2/f.Details
legalize & repair (e) storage room by water damage. convert closet to powder room under staircase & install kitchenette at playroom at g/f. repair (e) deck at rear in-kind (less than 50%) & remove un-permitted cover above deck, convert back to (e) condition at 2/f. | $65,000 |