Back to kitchen remodel contractors
Ally Builder Llc
- Based in
- Newark
- On San Francisco permits
- Mar 2023 to Aug 2024
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 149 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2024 | Completed final sign-off Sep 2024 | 175 Bluxome St | remodel existing bathtub to shower in the master bathroom; replace (e) cabinet to remain in existing location in kitchenDetails
remodel existing bathtub to shower in the master bathroom; replace (e) cabinet to remain in existing location in kitchen | $10,000 |