Back to kitchen remodel contractors
Alltrade Hi - Tech Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2005 to Aug 2026
- Last 24 months
- 7 permits filed
25 permits since 2000: 17 completed, 3 in progress, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 2 days from filing to permit and 76 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2023 | Completed final sign-off Aug 2023 | 184 Clipper St | kitchen remodel, install 5 circuits, 6 outlets, 4 recess lights, 2 pendent lights, new sink, new cabinets, new countertop. no new fixturesDetails
kitchen remodel, install 5 circuits, 6 outlets, 4 recess lights, 2 pendent lights, new sink, new cabinets, new countertop. no new fixtures | $20,000 |
| Jan 28, 2014 | Never finaled issued Jan 2014, no final | 807 Rolph St | to comply w/ nov#20133451. repair deck @ rear side. convert 2nd fl kitchen to family room. remove illegal 2 storage room. remove (e) front door garage to a new garage door. install railing from 1st fl to 2nd fl. minor electrical work.Details
to comply w/ nov#20133451. repair deck @ rear side. convert 2nd fl kitchen to family room. remove illegal 2 storage room. remove (e) front door garage to a new garage door. install railing from 1st fl to 2nd fl. minor electrical work. | $8,000 |
| Feb 26, 2007 | Completed final sign-off Mar 2007 | 286 27th Av | comply w/3r-4663. touch up, painting & fixture electrical fixture finished plumbing p-trap, vent pipe & kitchen sink capped.Details
comply w/3r-4663. touch up, painting & fixture electrical fixture finished plumbing p-trap, vent pipe & kitchen sink capped. | $3,000 |