Back to bathroom remodel contractors
Allround Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to Jun 2017
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 199 days from filing to permit and 268 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2010 | Completed final sign-off Aug 2011 | 279 Topaz Wy | new deck cantilevered 4' @ 2nd floor on (e) rear facade, accessed by sliding glass door. replacing windows 1 @ 2nd floor, 2 @ 1st floor. new bath & storage @ (e) 1st floor.Details
new deck cantilevered 4' @ 2nd floor on (e) rear facade, accessed by sliding glass door. replacing windows 1 @ 2nd floor, 2 @ 1st floor. new bath & storage @ (e) 1st floor. | $25,000 |