Back to kitchen remodel contractors
All Type Remodeling Inc
- Based in
- Sacramento
- On San Francisco permits
- Jan 2019 to Aug 2026
- Last 24 months
- 52 permits filed
126 permits since 2000: 114 completed, 9 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 1 in progress, 1 expired or cancelled. Typically 29 days from filing to permit and 330 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2025 | In progress issued Jun 2025 | 847 Arguello Bl | unit #2 - in kind kitchen remodel. replace cabinets, countertops, range hood, sink. add outlets. no changes to structure or relocation of kitchen components.Details
unit #2 - in kind kitchen remodel. replace cabinets, countertops, range hood, sink. add outlets. no changes to structure or relocation of kitchen components. | $18,000 |
| Jul 5, 2024 | Expired or cancelled expired Feb 2026 | 221 11th St | 3/f: to comply with nov 201652291 remove non bearing partition walls, re paint walls and ceiling. change hardwood flooring to another hardwood or marmoleum. change doors in partition walls. add lighting fixtures (n) ada entrance & kitchen counter with sink. mep deferredDetails
3/f: to comply with nov 201652291 remove non bearing partition walls, re paint walls and ceiling. change hardwood flooring to another hardwood or marmoleum. change doors in partition walls. add lighting fixtures (n) ada entrance & kitchen counter with sink. mep deferred | $100,000 |
| Jul 3, 2024 | Completed final sign-off Feb 2025 | 80 Kissling St | (1) kitchen and (1) bathroom remodel to comply with nov#202422617. install flooring/railing on deckDetails
(1) kitchen and (1) bathroom remodel to comply with nov#202422617. install flooring/railing on deck | $10,000 |
| Nov 19, 2020 | Completed final sign-off Feb 2022 | 124 Otsego Av | in 2nd flr: remodel existing kitchen and bathroom. add a skylight above bathroom. add a stair to backyardDetails
in 2nd flr: remodel existing kitchen and bathroom. add a skylight above bathroom. add a stair to backyard | $28,000 |
| Jan 22, 2019 | Completed final sign-off Feb 2020 | 2651 44th Av | to comply with nov #201893781: at 1st floor remodel extg bedroom and bathroom, new home office and bathroom, relocate laundry area. at 2nd floor, remodel extg kitchen, living, dining and bathroom. infill extg lightwell, remove stair, and replace extg windows in kind, new front entry door.Details
to comply with nov #201893781: at 1st floor remodel extg bedroom and bathroom, new home office and bathroom, relocate laundry area. at 2nd floor, remodel extg kitchen, living, dining and bathroom. infill extg lightwell, remove stair, and replace extg windows in kind, new front entry door. | $89,000 |