Back to bathroom remodel contractors
All Star Team Construction
- Based in
- Alameda
- On San Francisco permits
- Jan 2014 to May 2026
- Last 24 months
- 1 permit filed
13 permits since 2000: 8 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 2 days from filing to permit and 197 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 15, 2018 | Completed final sign-off Apr 2019 | 135 Arbor St | bathroom remodel, replacement of (e) fixtures and shower. same layout as before. remodel in kind, no structural work, comply w/ cec 150.0(k) 5Details
bathroom remodel, replacement of (e) fixtures and shower. same layout as before. remodel in kind, no structural work, comply w/ cec 150.0(k) 5 | $10,000 |
| Mar 14, 2018 | Completed final sign-off Sep 2019 | 1622 Ingalls St | 1st flr - add 2 bedrooms, 2 full baths and media room. 2nd flr - legalize 1 full bath. infill and new deck at rearDetails
1st flr - add 2 bedrooms, 2 full baths and media room. 2nd flr - legalize 1 full bath. infill and new deck at rear | $80,000 |
| Nov 28, 2016 | Completed final sign-off Jun 2017 | 3201 Washington St | apt 7: add new wiring & subpanel. remodel kitchen & bathroom in same layout. no reloation of walls moved, removed, added or infilled. all (e) layouts unchanged.Details
apt 7: add new wiring & subpanel. remodel kitchen & bathroom in same layout. no reloation of walls moved, removed, added or infilled. all (e) layouts unchanged. | $1,500 |
| Mar 26, 2014 | Never finaled issued Mar 2014, no final | 2734 Gough St | new drywall for demoed wall & ceiling. 2 bedroom, living, kitchen, 2 baths, rev. to applic. 2013-12-24-4991.Details
new drywall for demoed wall & ceiling. 2 bedroom, living, kitchen, 2 baths, rev. to applic. 2013-12-24-4991. | $7,500 |
| Mar 21, 2014 | Completed final sign-off Jun 2014 | 333 01st St | unit #n-1207 - remodel bathroom & kitchen fixtures & cabinets in kind. no windows or doors on this permit. n/a maher ordidance # 155-13Details
unit #n-1207 - remodel bathroom & kitchen fixtures & cabinets in kind. no windows or doors on this permit. n/a maher ordidance # 155-13 | $24,000 |
| Jan 14, 2014 | Completed final sign-off Jul 2015 | 1155 Church St | change of use to convert lower flr of lower unit into an (e) 2 unit building into a 3rd unit. scope of interior work to include a new kitchen & the reconfiguration of (2) bathrooms & a family room into a bedroom & the removal of a stair as shown on appl#201312053445. no exterior work to be performedDetails
change of use to convert lower flr of lower unit into an (e) 2 unit building into a 3rd unit. scope of interior work to include a new kitchen & the reconfiguration of (2) bathrooms & a family room into a bedroom & the removal of a stair as shown on appl#201312053445. no exterior work to be performed | $15,000 |