All Star General Contractor
- Based in
- Richmond
- On San Francisco permits
- Sep 2009 to Sep 2011
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 6, 2011 | Completed final sign-off Sep 2011 | 2127 Ocean Av | kitchen & bathroom remodel; remove old cabinets and counter top & replace them in kind replace existing tub sink, toilet, and tile and repl them in kind, no structural work, no new lightingDetails
kitchen & bathroom remodel; remove old cabinets and counter top & replace them in kind replace existing tub sink, toilet, and tile and repl them in kind, no structural work, no new lighting | $18,000 |
| Sep 28, 2009 | Completed final sign-off Feb 2010 | 474 Holyoke St | remove illegal stove range on garage level to comply with n.o.v#200914361, aug. 26,2009 & kitchen remodel @ main floor; install (n) cabinets,(n) sink & (n) floor tile floor on second floor.Details
remove illegal stove range on garage level to comply with n.o.v#200914361, aug. 26,2009 & kitchen remodel @ main floor; install (n) cabinets,(n) sink & (n) floor tile floor on second floor. | $10,000 |