Back to kitchen remodel contractors
All About Service Construction
- Based in
- Antioch
- On San Francisco permits
- Jun 2010 to Sep 2013
- Last 24 months
- 0 permits filed
14 permits since 2000: 9 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 6 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2013 | Completed final sign-off Aug 2014 | 300 Beale St | kitchen remodel: new cabinets, countertop, sink, appliances, new outlets under cabinet led lights, over cabinet lights, 5 ceiling lights, lights in dining room/living room; 1/2 bath - new sink, 3 ceiling lights, 2 sconce lights, cabinet, countertop.Details
kitchen remodel: new cabinets, countertop, sink, appliances, new outlets under cabinet led lights, over cabinet lights, 5 ceiling lights, lights in dining room/living room; 1/2 bath - new sink, 3 ceiling lights, 2 sconce lights, cabinet, countertop. | $62,000 |
| May 10, 2013 | Never finaled issued May 2013, no final | 333 Bush St | remodel kitchen, cabinets, counter tops, floors, appliances, 6 can lights (led), led under cabinet lights, add 6 can lights in living room 4 can lights in dining room, 4 can lights, in bedroom, no change on wallsDetails
remodel kitchen, cabinets, counter tops, floors, appliances, 6 can lights (led), led under cabinet lights, add 6 can lights in living room 4 can lights in dining room, 4 can lights, in bedroom, no change on walls | $60,000 |
| Feb 5, 2013 | Completed final sign-off Nov 2013 | 300 Beale St | one kitchen remodel- new cabinets, countertops, sink faucent, 2 fridge, dishwasher, surface mount lights, under cabinet lights. 50% wattage minimum kitchen lighting to be high efficacy. one bathroom remodel - new cabinets, countertops, sink faucet, steam shower, shower valve-recessed lights (4),Details
one kitchen remodel- new cabinets, countertops, sink faucent, 2 fridge, dishwasher, surface mount lights, under cabinet lights. 50% wattage minimum kitchen lighting to be high efficacy. one bathroom remodel - new cabinets, countertops, sink faucet, steam shower, shower valve-recessed lights (4), | $170,000 |
| Sep 18, 2012 | Never finaled issued Sep 2012, no final | 333 Bush St | kitchen - paint cabinets, change counter tops, new sink, 6 led can lights, 4 under cabinet lights, new floor hall bathroom - new shower pan, toilet, vainity, sink, tile shower, heated vent fan, vanity light master bathroom - new shower pan, bathtub, toilet, 2 sink faucets, tub valve, shower valve,Details
kitchen - paint cabinets, change counter tops, new sink, 6 led can lights, 4 under cabinet lights, new floor hall bathroom - new shower pan, toilet, vainity, sink, tile shower, heated vent fan, vanity light master bathroom - new shower pan, bathtub, toilet, 2 sink faucets, tub valve, shower valve, | $70,000 |
| Apr 2, 2012 | Completed final sign-off Oct 2012 | 300 Beale St | kitchen remodel- new cabinets, countertop, appliances, 6 lights led recessed, 6 gfci outlets, 3 new circuits, under cabinet lights, upstairs bathroom 1- new cabinets, 2 lights led, toilet, sink. master bath- new shower, cabinets, countertop, sinks, 4 lights, 2 outlets, 2nd master- bathtub, cabinets,Details
kitchen remodel- new cabinets, countertop, appliances, 6 lights led recessed, 6 gfci outlets, 3 new circuits, under cabinet lights, upstairs bathroom 1- new cabinets, 2 lights led, toilet, sink. master bath- new shower, cabinets, countertop, sinks, 4 lights, 2 outlets, 2nd master- bathtub, cabinets, | $120,000 |
| Jan 4, 2012 | Completed final sign-off Feb 2012 | 640 Victoria St | change kitchen window to new. change windows @ rear of home to new white vinyl. u factor less than or equal to 0.40.Details
change kitchen window to new. change windows @ rear of home to new white vinyl. u factor less than or equal to 0.40. | $5,000 |
| Nov 30, 2011 | Completed final sign-off Feb 2012 | 640 Victoria St | interior kitchen remodel: new cabinets/countertops, appliances, repair sheetrock, frame in door, add arched opening into nook, relocate heat register, 5 can lights in kitchen, 5 outlets, under cabinet light, new subpanel, water line @ fridge, 1 light in closet, 1 light @ stairs, master closet 2xDetails
interior kitchen remodel: new cabinets/countertops, appliances, repair sheetrock, frame in door, add arched opening into nook, relocate heat register, 5 can lights in kitchen, 5 outlets, under cabinet light, new subpanel, water line @ fridge, 1 light in closet, 1 light @ stairs, master closet 2x | $52,000 |
| Aug 5, 2011 | Completed final sign-off Mar 2012 | 152 Lombard St | kitchen - new cabinets, counter tops, appliances, 6 fluorescnet can lights, add small appliance, circuits, new sink, floor, master bathroom - new cabinet, counter top, sink, shower pan, walls, new light, occupancy sensor, shower valve, hall bath - new cabinet, counter top, sink, bath tub, walls, newDetails
kitchen - new cabinets, counter tops, appliances, 6 fluorescnet can lights, add small appliance, circuits, new sink, floor, master bathroom - new cabinet, counter top, sink, shower pan, walls, new light, occupancy sensor, shower valve, hall bath - new cabinet, counter top, sink, bath tub, walls, new | $82,412 |
| Sep 24, 2010 | Expired or cancelled expired Oct 2013 | 300 Beale St | unit # 407: remove and replace kitchen cabinets, counters, appliances, lighting, update electrical outlets. add circuit for fridge, wine fridge,microwave, replace countertops in bathrooms, remove shower walls and replace with tile. connect all new sinks in kitchen and bath.Details
unit # 407: remove and replace kitchen cabinets, counters, appliances, lighting, update electrical outlets. add circuit for fridge, wine fridge,microwave, replace countertops in bathrooms, remove shower walls and replace with tile. connect all new sinks in kitchen and bath. | $25,934 |
| Aug 9, 2010 | Never finaled issued Aug 2010, no final | 219 Brannan St | replace kitchen cabinets, countertops, bathroom cabinets. cost included in 201006013597Details
replace kitchen cabinets, countertops, bathroom cabinets. cost included in 201006013597 | $6,800 |