Alfred Bay
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Mar 2013
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 373 days from filing to permit and 1106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2013 | Completed final sign-off Apr 2017 | 46 San Jacinto Wy | convert (e) unfinished space to occupied space, remodel kitchen & add 1 bedroom & 1-1/2 baths. insulate, seismic, new elec, furnace, w.heater, windows, flooring. replace 3rd floor ceiling assemblys & 1/2 of roof, reroof.Details
convert (e) unfinished space to occupied space, remodel kitchen & add 1 bedroom & 1-1/2 baths. insulate, seismic, new elec, furnace, w.heater, windows, flooring. replace 3rd floor ceiling assemblys & 1/2 of roof, reroof. | $300,000 |