Back to kitchen remodel contractors
Alfa Building Solutions Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2010 to Aug 2026
- Last 24 months
- 4 permits filed
30 permits since 2000: 25 completed, 3 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 7 completed, 2 never finaled. Typically 2 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 3, 2024 | Completed final sign-off Feb 2025 | 719 Spruce St | convert 1/f of unit #1 into a new adu utilizing the ca. state adu program per gov. code sec. 65852.2; adu will have (n) kitchen, living-eating area, sleeping alcove & bath. unit will retain (e) windows & (e) sep. electric heat source. note: this work is in addition to approved pa# 202310108258Details
convert 1/f of unit #1 into a new adu utilizing the ca. state adu program per gov. code sec. 65852.2; adu will have (n) kitchen, living-eating area, sleeping alcove & bath. unit will retain (e) windows & (e) sep. electric heat source. note: this work is in addition to approved pa# 202310108258 | $5,000 |
| Dec 20, 2022 | Completed final sign-off Dec 2023 | 1441 Fulton St | kitchen & bathroom remodel in-kind. new electrical outles & lightsDetails
kitchen & bathroom remodel in-kind. new electrical outles & lights | $49,000 |
| Mar 8, 2022 | Never finaled issued Mar 2022, no final | 130 Westgate Dr | kitchen & 2 bathrooms remodel in-kind. new electrical outlets & lights. new subpanel. no wall removalDetails
kitchen & 2 bathrooms remodel in-kind. new electrical outlets & lights. new subpanel. no wall removal | $55,800 |
| Jan 28, 2022 | Never finaled issued Jan 2022, no final | 174 Miramar Av | kitchen remodel, like for likeDetails
kitchen remodel, like for like | $15,000 |
| Dec 10, 2020 | Completed final sign-off Dec 2021 | 2060 Sutter St | 2 bath remodel and kitchen remodel in kind. no change to the floor plan or walls. new outlets, switches and light fixturesDetails
2 bath remodel and kitchen remodel in kind. no change to the floor plan or walls. new outlets, switches and light fixtures | $42,000 |
| Jun 10, 2020 | Completed final sign-off Jun 2021 | 772 20th Av | remodel 1 kitchen and 1 bathroom at 2nd floor, like for like. replace windows with sierra traditional craftsman 7/8" sdl aluminum-clad wood windows (casements and fixed at front) same size same locationDetails
remodel 1 kitchen and 1 bathroom at 2nd floor, like for like. replace windows with sierra traditional craftsman 7/8" sdl aluminum-clad wood windows (casements and fixed at front) same size same location | $84,000 |
| Jul 20, 2015 | Completed final sign-off Jan 2016 | 1222 26th Av | kitchen remodel, fixtures to keep same location.Details
kitchen remodel, fixtures to keep same location. | $50,000 |
| Aug 27, 2013 | Completed final sign-off Dec 2013 | 145 Lakeview Av | new kitchen cabinets and appliances. open up kitchen to dining room, new furnace. remove portion of corrugated plasting roofing over parking space, replace windowssDetails
new kitchen cabinets and appliances. open up kitchen to dining room, new furnace. remove portion of corrugated plasting roofing over parking space, replace windowss | $40,000 |
| Dec 21, 2012 | Completed final sign-off May 2013 | 2527 29th Av | kitchen remodel openings in 2 wall from kitchen, add toilet & relocate bathtub on 2nd fl. replace (e) exterior steps w/ (n). add (n)bathroom, (n)den, (n) guest bedroom on ground fl. replace windows in front, back & lightwell same size. replace furnace w/ (n) high efficiency furnace. add 245 sqDetails
kitchen remodel openings in 2 wall from kitchen, add toilet & relocate bathtub on 2nd fl. replace (e) exterior steps w/ (n). add (n)bathroom, (n)den, (n) guest bedroom on ground fl. replace windows in front, back & lightwell same size. replace furnace w/ (n) high efficiency furnace. add 245 sq | $75,000 |