Back to kitchen remodel contractors
Alex Kobylik Construction
- Based in
- Martinez
- On San Francisco permits
- Oct 2005 to Aug 2014
- Last 24 months
- 0 permits filed
13 permits since 2000: 5 completed, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 2 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2014 | Completed final sign-off Dec 2014 | 1719 La Salle Av | remodel of one kitchen and bath. new appliances, cabinet and sink, undermount lights, paint kitchennew tiles, new light fixture. bathroom remove tub replace with shower, new vanity new light, add lighting in ceiling, new floors, new tile surround.Details
remodel of one kitchen and bath. new appliances, cabinet and sink, undermount lights, paint kitchennew tiles, new light fixture. bathroom remove tub replace with shower, new vanity new light, add lighting in ceiling, new floors, new tile surround. | $55,000 |
| Mar 31, 2014 | Never finaled issued Mar 2014, no final | 415 Bryant St | remove/replace kitchen cabinetry, install new cabinets countertop, paint, relocate electrical/plumbing.Details
remove/replace kitchen cabinetry, install new cabinets countertop, paint, relocate electrical/plumbing. | $13,500 |
| May 24, 2012 | Completed final sign-off Sep 2012 | 2211 California St | kitchen remodel - new cabinets, counter top, lights, approx 50 sq.ft. ; revision of pa 201109124426; lighing must comply with cec 150(k)Details
kitchen remodel - new cabinets, counter top, lights, approx 50 sq.ft. ; revision of pa 201109124426; lighing must comply with cec 150(k) | $8,000 |
| May 6, 2011 | Expired or cancelled expired Oct 2012 | 1245 Broadway | unit #1-kitchen remodel-remove/replace cabinets, fixtures, add dishwasher, update electrical, plumbing. lighting to comply with cec 150(k)Details
unit #1-kitchen remodel-remove/replace cabinets, fixtures, add dishwasher, update electrical, plumbing. lighting to comply with cec 150(k) | $10,000 |
| Apr 21, 2010 | Never finaled issued Apr 2010, no final | 115 Belvedere St | bathroom remodel: remove/replace fixtures; new faucet, tub & light. replace 2-new windows @ bath & kitchen. new lights in the kitchen & new wiring. min 50% of light watt from h.e. light @ kitchen, h.e. light or o.s. (manual on) @ bath.Details
bathroom remodel: remove/replace fixtures; new faucet, tub & light. replace 2-new windows @ bath & kitchen. new lights in the kitchen & new wiring. min 50% of light watt from h.e. light @ kitchen, h.e. light or o.s. (manual on) @ bath. | $9,500 |
| Dec 1, 2009 | Expired or cancelled expired Mar 2012 | 393 Corbett Av | remove non-bearing wall between kitchen & dining area, patching drywall, paint, move light.Details
remove non-bearing wall between kitchen & dining area, patching drywall, paint, move light. | $3,490 |