Permit GraphShortlistSan Francisco building permits since 2000

Alco Carpentry Co

Contractor license
1082623
State license record
Based in
El Sobrante
On San Francisco permits
Apr 2023 to Feb 2025
Last 24 months
1 permit filed

3 permits since 2000: 3 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllDeck 1Stairs 3

3 stairs permits: 3 completed. Typically 48 days from filing to permit and 131 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Feb 26, 2025Completed
final sign-off Sep 2025
1631 47th Avdeck and stairs at rear yard, wood patio at ground floor, three new doors and 1 window at back rear wall, demolish closet at second floor, add interior door in office.
Details
Permit
202502261144
Status
complete
Filed
Feb 26, 2025
Permit issued
Apr 15, 2025
Final sign-off
Sep 12, 2025
Declared cost
$40,000
Address
1631 47th Av

deck and stairs at rear yard, wood patio at ground floor, three new doors and 1 window at back rear wall, demolish closet at second floor, add interior door in office.

Open the permit page

$40,000
Aug 27, 2024Completed
final sign-off Apr 2025
841 Vallejo Stremove and replace existing water heater storage post and pier foundation with new raised floor foundation. approx 85sf. replace siding due to dry rot at rear storage (3 stories). all work at rear building (r3). new rear stair around 28" above grade.
Details
Permit
202408279513
Status
complete
Filed
Aug 27, 2024
Permit issued
Dec 12, 2024
Final sign-off
Apr 22, 2025
Declared cost
$20,000
Address
841 Vallejo St

remove and replace existing water heater storage post and pier foundation with new raised floor foundation. approx 85sf. replace siding due to dry rot at rear storage (3 stories). all work at rear building (r3). new rear stair around 28" above grade.

Open the permit page

$20,000
Apr 17, 2023Completed
final sign-off Jul 2023
4 Crestlake Drdemolish existing front entry stairs, replace structure and new stone.
Details
Permit
202304175838
Status
complete
Filed
Apr 17, 2023
Permit issued
Apr 27, 2023
Final sign-off
Jul 11, 2023
Declared cost
$16,000
Address
4 Crestlake Dr

demolish existing front entry stairs, replace structure and new stone.

Open the permit page

$16,000