Albertoli Construction Corp.
- Based in
- San Rafael
- On San Francisco permits
- Feb 2006 to Nov 2019
- Last 24 months
- 0 permits filed
11 permits since 2000: 6 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2017 | Completed final sign-off Apr 2018 | 64 Heather Av | kitchen remodel, cabinets, counter tops, plumbing, elec. move elec panel out of closet onto hall wall. no structural work.Details
kitchen remodel, cabinets, counter tops, plumbing, elec. move elec panel out of closet onto hall wall. no structural work. | $14,500 |
| Feb 18, 2016 | Completed final sign-off Apr 2016 | 2020 Stockton St | kitchen remodel: change cabinets to new and appliances. same location sink. move gas for cooktop . add wall overn. add large hood. add new lighting, change out laundry sink. no structural work.Details
kitchen remodel: change cabinets to new and appliances. same location sink. move gas for cooktop . add wall overn. add large hood. add new lighting, change out laundry sink. no structural work. | $35,600 |
| Feb 2, 2006 | Completed final sign-off Jul 2006 | 463 Buena Vista East Av | kitchen remodel with pass thru at unit #2 at third floor level - fluorescent lightingDetails
kitchen remodel with pass thru at unit #2 at third floor level - fluorescent lighting | $27,000 |