Back to kitchen remodel contractors
Alaska Refrig & Hvac
- Based in
- Oakland
- On San Francisco permits
- Nov 2026 to Nov 2026
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 6 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2026 | Completed final sign-off Nov 2026 | 235 Church St | replacement of an existing rooftop kitchen hood exhaust ventilator with a new dayton-brand backward-inclined rooftop unit (model #391nas) rated for 1999 cfm @ 1.0 in sf & 2,634 cfm @ 0 sp. install a spring shock absorber to reduce noise & vibration between new unit and rooftop surface.Details
replacement of an existing rooftop kitchen hood exhaust ventilator with a new dayton-brand backward-inclined rooftop unit (model #391nas) rated for 1999 cfm @ 1.0 in sf & 2,634 cfm @ 0 sp. install a spring shock absorber to reduce noise & vibration between new unit and rooftop surface. | $33,750 |