Back to bathroom remodel contractors
Alan Zhu Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Dec 2013
- Last 24 months
- 0 permits filed
19 permits since 2000: 18 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 64 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2012 | Completed final sign-off Feb 2013 | 1682 33rd Av | convert existing space ground floor to a living area (game room) and full bathDetails
convert existing space ground floor to a living area (game room) and full bath | $18,000 |
| Dec 12, 2011 | Completed final sign-off Jan 2012 | 106 Delano Av | bathroom, tile, fan, faucet, floor tile, remodel bathroom, no change on walls and openingDetails
bathroom, tile, fan, faucet, floor tile, remodel bathroom, no change on walls and opening | $7,000 |
| Feb 24, 2009 | Completed final sign-off Mar 2009 | 767 Sweeny St | revised approved apn#2008/0919/2080 to show as built. raised sub-floor on ground floor. reduce bath area at ground floor.Details
revised approved apn#2008/0919/2080 to show as built. raised sub-floor on ground floor. reduce bath area at ground floor. | |
| Sep 19, 2008 | Completed final sign-off May 2009 | 767 Sweeny St | proposed install bedroom, family room & bathroom at 1st floor.Details
proposed install bedroom, family room & bathroom at 1st floor. | $28,000 |
| Nov 6, 2006 | Completed final sign-off Apr 2007 | 133 Cornwall St | remodel kchn. cabinets countertop. sink floor. remoding bathroom. tile vanity faucet. change furnace heater. floruescent lighting efficiency 80% work on unit 133 onlyDetails
remodel kchn. cabinets countertop. sink floor. remoding bathroom. tile vanity faucet. change furnace heater. floruescent lighting efficiency 80% work on unit 133 only | $18,500 |
| Oct 19, 2000 | Completed final sign-off Dec 2000 | 39 Carmel St | repair bathroom, change vanity, tub & tile.Details
repair bathroom, change vanity, tub & tile. | $3,800 |