Back to bathroom remodel contractors
Ajamian Enterprises
- Based in
- Greenbrae
- On San Francisco permits
- May 2000 to May 2014
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 256 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2009 | Completed final sign-off Oct 2010 | 61 Stanyan St | convert 8 sf lightwell and 12 sf of atrium at 2nd fl to dwelling. convert 92 sf of garage area 1st fl to dwelling area. kitchen /bath remodel 2nd fl. bedrm,bath,laundry remodel 1st fl.new matching patio doors 1st fl rear, new furnace/water heaterDetails
convert 8 sf lightwell and 12 sf of atrium at 2nd fl to dwelling. convert 92 sf of garage area 1st fl to dwelling area. kitchen /bath remodel 2nd fl. bedrm,bath,laundry remodel 1st fl.new matching patio doors 1st fl rear, new furnace/water heater | $216,000 |
| Aug 21, 2006 | Completed final sign-off Aug 2007 | 164 Parker Av | kitchen remodel with new fixtures and cabinets. removal of nonstructural walls and addition of pocket door. new fixtures and 1 new cabinet in bathroom. 1 bath remodel. new washer and dryer and tankless water heater.Details
kitchen remodel with new fixtures and cabinets. removal of nonstructural walls and addition of pocket door. new fixtures and 1 new cabinet in bathroom. 1 bath remodel. new washer and dryer and tankless water heater. | $25,000 |
| Dec 12, 2005 | Completed final sign-off May 2006 | 61 Danton St | replace tub, toilet, sink, faucet in bathroom, repalce kitchen cabinets, sink,m faucet, dishwasher, disposal, new lighting. at least 50% jof installed luminaires to be high efficency lighting, work sheets wil be shown to building inspectror.Details
replace tub, toilet, sink, faucet in bathroom, repalce kitchen cabinets, sink,m faucet, dishwasher, disposal, new lighting. at least 50% jof installed luminaires to be high efficency lighting, work sheets wil be shown to building inspectror. | $37,000 |
| May 30, 2000 | Completed final sign-off Sep 2000 | 256 Magellan Av | remodel existing bathroomDetails
remodel existing bathroom | $7,000 |