Ajamian Enterprises
- Based in
- Greenbrae
- On San Francisco permits
- May 2000 to May 2014
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 8, 2014 | Completed final sign-off Mar 2015 | 3415 Divisadero St | install shear wall at existing structure at backyard. replacing existing brace frame.Details
install shear wall at existing structure at backyard. replacing existing brace frame. | $4,200 |
| Oct 1, 2012 | Completed final sign-off Dec 2012 | 181 Marina Bl | replace (e) rotted windows, w/ same style windows. all windows in back of bldg approx. 25.Details
replace (e) rotted windows, w/ same style windows. all windows in back of bldg approx. 25. | $28,600 |
| Aug 11, 2009 | Completed final sign-off Oct 2010 | 61 Stanyan St | convert 8 sf lightwell and 12 sf of atrium at 2nd fl to dwelling. convert 92 sf of garage area 1st fl to dwelling area. kitchen /bath remodel 2nd fl. bedrm,bath,laundry remodel 1st fl.new matching patio doors 1st fl rear, new furnace/water heaterDetails
convert 8 sf lightwell and 12 sf of atrium at 2nd fl to dwelling. convert 92 sf of garage area 1st fl to dwelling area. kitchen /bath remodel 2nd fl. bedrm,bath,laundry remodel 1st fl.new matching patio doors 1st fl rear, new furnace/water heater | $216,000 |
| Sep 26, 2008 | Completed final sign-off Dec 2009 | 51 Scott St | recongifuration of window @ ground level rear wall.Details
recongifuration of window @ ground level rear wall. | $300 |
| Jul 24, 2008 | Completed final sign-off Jan 2010 | 51 Scott St | replace existing wood windows with new wood windows. add new staircase to garagae. new door at garage. to comply with n.o.v. 20072796. new main door at garage. remove existing rear addition at second floor. remove stai at rear yard.Details
replace existing wood windows with new wood windows. add new staircase to garagae. new door at garage. to comply with n.o.v. 20072796. new main door at garage. remove existing rear addition at second floor. remove stai at rear yard. | $40,000 |
| May 31, 2007 | Completed final sign-off Nov 2007 | 256 Magellan Av | replace 4 wndws match extg wood frame. dryrot repair and restucco opened areas at front of property. refurbish extg wood 4 pane over solid swig out windows. (new double pane glass ok) quantity 3 on ground floor. one on 2nd floorDetails
replace 4 wndws match extg wood frame. dryrot repair and restucco opened areas at front of property. refurbish extg wood 4 pane over solid swig out windows. (new double pane glass ok) quantity 3 on ground floor. one on 2nd floor | $18,000 |
| Aug 21, 2006 | Completed final sign-off Aug 2007 | 164 Parker Av | kitchen remodel with new fixtures and cabinets. removal of nonstructural walls and addition of pocket door. new fixtures and 1 new cabinet in bathroom. 1 bath remodel. new washer and dryer and tankless water heater.Details
kitchen remodel with new fixtures and cabinets. removal of nonstructural walls and addition of pocket door. new fixtures and 1 new cabinet in bathroom. 1 bath remodel. new washer and dryer and tankless water heater. | $25,000 |
| Dec 12, 2005 | Completed final sign-off May 2006 | 61 Danton St | replace tub, toilet, sink, faucet in bathroom, repalce kitchen cabinets, sink,m faucet, dishwasher, disposal, new lighting. at least 50% jof installed luminaires to be high efficency lighting, work sheets wil be shown to building inspectror.Details
replace tub, toilet, sink, faucet in bathroom, repalce kitchen cabinets, sink,m faucet, dishwasher, disposal, new lighting. at least 50% jof installed luminaires to be high efficency lighting, work sheets wil be shown to building inspectror. | $37,000 |
| May 30, 2000 | Completed final sign-off Sep 2000 | 256 Magellan Av | remodel existing bathroomDetails
remodel existing bathroom | $7,000 |