Air Filtration Co. Inc.
- Based in
- Oroville
- On San Francisco permits
- Jul 2004 to Dec 2015
- Last 24 months
- 0 permits filed
19 permits since 2000: 8 completed, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2015 | Completed final sign-off Jan 2016 | 5666 Mission St | revision to 201509217597, as build - install two 12 inch 90 degree elbows.Details
revision to 201509217597, as build - install two 12 inch 90 degree elbows. | |
| Sep 21, 2015 | Completed final sign-off Jan 2016 | 5666 Mission St | install new autobdy spray booth, mixing room and prep bench. replacing (e) in same location.Details
install new autobdy spray booth, mixing room and prep bench. replacing (e) in same location. | $110,000 |
| Jan 24, 2014 | Never finaled issued Mar 2014, no final | 2715 Geary Bl | add heated air make-up system to extg permitted auto paint spray booth.Details
add heated air make-up system to extg permitted auto paint spray booth. | $30,700 |
| Mar 15, 2012 | Completed final sign-off Jul 2012 | 1315 Carroll Av | installation of automotive style paint spray booth w/6' exhaust duct above roofline. use of equipment for "event co" - not automotive. under separate permit - fire suppression by licensed contractor - not afc)Details
installation of automotive style paint spray booth w/6' exhaust duct above roofline. use of equipment for "event co" - not automotive. under separate permit - fire suppression by licensed contractor - not afc) | $45,600 |
| Jan 9, 2012 | Completed final sign-off Feb 2013 | 2220 Revere Av | #b: mechanical installation of auto paint spray booth with heated air make up system. exhaust duct terminating 6ft above roof line. fire suppression done by sub-contractor, not afc. replace (e) spray boothDetails
#b: mechanical installation of auto paint spray booth with heated air make up system. exhaust duct terminating 6ft above roof line. fire suppression done by sub-contractor, not afc. replace (e) spray booth | $61,530 |
| Aug 10, 2011 | Never finaled issued Aug 2011, no final | 2715 Geary Bl | install exhaust filter bench for sanding only in (e) auto body shop. includes exhaust duct terminating 6 ft above roof line. also installation of curtains to enclose exhaust benchDetails
install exhaust filter bench for sanding only in (e) auto body shop. includes exhaust duct terminating 6 ft above roof line. also installation of curtains to enclose exhaust bench | $12,900 |
| Jun 12, 2009 | Expired or cancelled cancelled Jan 2026 | 505 South Van Ness Av | installation of exhaust bench with exhaust duct 6ft above roof line. prupose-spot paint bumpers repairDetails
installation of exhaust bench with exhaust duct 6ft above roof line. prupose-spot paint bumpers repair | $30,000 |
| May 5, 2009 | Completed final sign-off Dec 2009 | 165 14th St | install 1 auto paint spray booth w/ heated air make-up system, 1 paint mix rm, 1 exhaust bench w/ duct 6 ft above roof line, new booth replaces existing paint booth w/ duct, exhaust bench is existing and is being replaced, restroom by fong's const. fire protection separate permitDetails
install 1 auto paint spray booth w/ heated air make-up system, 1 paint mix rm, 1 exhaust bench w/ duct 6 ft above roof line, new booth replaces existing paint booth w/ duct, exhaust bench is existing and is being replaced, restroom by fong's const. fire protection separate permit | $114,515 |
| May 5, 2009 | Never finaled issued May 2009, no final | 2715 Geary Bl | install auto paint spray booth w/ exhaust duet 6ft above roof line. revision to 200812178667, spray booth manufacturer changeDetails
install auto paint spray booth w/ exhaust duet 6ft above roof line. revision to 200812178667, spray booth manufacturer change | |
| Mar 24, 2009 | Expired or cancelled cancelled Jan 2026 | 1419 Pacific Av | installation of exhaust filtered bench with duct 6ft above roof line (for paint prep sanding). fire suppression by sub-contractor filed seperatelyDetails
installation of exhaust filtered bench with duct 6ft above roof line (for paint prep sanding). fire suppression by sub-contractor filed seperately | $14,146 |
| Jan 27, 2009 | Never finaled issued Feb 2009, no final | 450 Potrero Av | replace existing spray paint with new auto paint spray booth with heated air make-up system, duct 6' above roof line. also add (1) paint mix room. correct 1 restroom door swing. fire suppression by licensed contractor, not afc.Details
replace existing spray paint with new auto paint spray booth with heated air make-up system, duct 6' above roof line. also add (1) paint mix room. correct 1 restroom door swing. fire suppression by licensed contractor, not afc. | $116,273 |
| Mar 25, 2008 | Expired or cancelled expired May 2010 | 4352 Mission St | sheet metal erection of booth, air makeup. installation of automotive paint spray booth with fresh air make-up (no heat) & duct above roof line. roof penetration, air line plumbing, electrical hook-up of booth. fire suppression by others.Details
sheet metal erection of booth, air makeup. installation of automotive paint spray booth with fresh air make-up (no heat) & duct above roof line. roof penetration, air line plumbing, electrical hook-up of booth. fire suppression by others. | $45,860 |
| Jul 19, 2007 | Never finaled issued Aug 2007, no final | 3536 Sacramento St | install 3 stacks of 25-1/2" dia. duct to existing exhaust duct. (securing with guide wires)Details
install 3 stacks of 25-1/2" dia. duct to existing exhaust duct. (securing with guide wires) | $5,300 |
| Jul 19, 2005 | Completed final sign-off Mar 2006 | 981 Howard St | relocation of customers (e) paint spray booth (automotive) air filtration model ara2712, from sansomDetails
relocation of customers (e) paint spray booth (automotive) air filtration model ara2712, from sansom | $17,367 |
| Jan 6, 2005 | Never finaled issued Apr 2005, no final | 1835 Folsom St | installation of metal canopy over paint spray booth. (paint spray booth under#200407280072Details
installation of metal canopy over paint spray booth. (paint spray booth under#200407280072 | $7,300 |
| Dec 22, 2004 | Expired or cancelled cancelled Mar 2007 | 150 Toland St | #5 - mechanical installation of automative spray paint booth with fresh aire make up intake &Details
#5 - mechanical installation of automative spray paint booth with fresh aire make up intake & | $35,500 |
| Aug 10, 2004 | Expired or cancelled expired Mar 2007 | 440 09th St | mechanical installation of automtoive spray paint booth, w/heated air makeup & duct, auto prep bencDetails
mechanical installation of automtoive spray paint booth, w/heated air makeup & duct, auto prep benc | $116,500 |
| Aug 10, 2004 | Completed final sign-off Aug 2005 | 384 07th St | mechanical installation of automotive spray paint booth w/fresh air makeup and ductsDetails
mechanical installation of automotive spray paint booth w/fresh air makeup and ducts | $36,200 |
| Jul 28, 2004 | Completed final sign-off Mar 2006 | 1835 Folsom St | mechanical installation of automotive spray paintDetails