Back to bathroom remodel contractors
Aileron Builders
- Based in
- Novato
- On San Francisco permits
- Jun 2006 to Apr 2022
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 11 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2022 | Completed final sign-off Aug 2022 | 220 Gellert Dr | one bath remodel: remove and replace existing tile; new shower pan; and drain; two new lights rywall repair new shower and tub fixtures.Details
one bath remodel: remove and replace existing tile; new shower pan; and drain; two new lights rywall repair new shower and tub fixtures. | $26,000 |
| Mar 28, 2013 | Completed final sign-off Jul 2013 | 763 Kansas St | rear cottage - remodel & enlargement of existing bathroom at 2nd floor. one window shall be replaced with new unit, voluntary wall strengthening included.Details
rear cottage - remodel & enlargement of existing bathroom at 2nd floor. one window shall be replaced with new unit, voluntary wall strengthening included. | $16,000 |
| Sep 5, 2012 | Completed final sign-off Jun 2013 | 854 Clayton St | interior remodel of existing bathroom & closets to create two bathrooms and one closet, includes removal of dropped ceiling over bathroom closet & adding new skylight well.Details
interior remodel of existing bathroom & closets to create two bathrooms and one closet, includes removal of dropped ceiling over bathroom closet & adding new skylight well. | $25,000 |