Block 1269, lot 068
854 Clayton St
- City’s use
- Single Family Residential
- Built
- 1907
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,491 sq ft
- Lot
- 2,644 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2024 | Completed final sign-off Sep 2024 | 854 Clayton St | Thomson Fabrication And Design | replace existing windows in laundry room/storage room. (2) 48"x36" slider - meeting title 24 standards. in kind' same size, same locations, max u-factor 0.30.Details
replace existing windows in laundry room/storage room. (2) 48"x36" slider - meeting title 24 standards. in kind' same size, same locations, max u-factor 0.30. | $2,500 |
| Jun 11, 2024 | Completed final sign-off Dec 2024 | 854 Clayton St | Thomson Fabrication And Design | add insulation & wallboard to laundry rm + garage. add 10 recessed led lights, install vct flooring, replace cabinets & countertop - laundry room, wall over existing window in laundry room. hot water heater installation. epoxy floor coating in garage - installation.Details
add insulation & wallboard to laundry rm + garage. add 10 recessed led lights, install vct flooring, replace cabinets & countertop - laundry room, wall over existing window in laundry room. hot water heater installation. epoxy floor coating in garage - installation. | $40,000 |
| Oct 2, 2023 | Expired or cancelled withdrawn Jun 2024 | 854 Clayton St | Casa Utopia Builders Inc | remodel/upgrade garagage, laundry and office area. isolaate and install drywall, new paint, new lpv flooring, new shelving storage, new sink/countertop in laundry, new recessed lighting, close off an interior window and door (located in crawl space)Details
remodel/upgrade garagage, laundry and office area. isolaate and install drywall, new paint, new lpv flooring, new shelving storage, new sink/countertop in laundry, new recessed lighting, close off an interior window and door (located in crawl space) | $40,000 |
| Sep 5, 2012 | Completed final sign-off Jun 2013 | 854 Clayton St | Aileron Builders | interior remodel of existing bathroom & closets to create two bathrooms and one closet, includes removal of dropped ceiling over bathroom closet & adding new skylight well.Details
interior remodel of existing bathroom & closets to create two bathrooms and one closet, includes removal of dropped ceiling over bathroom closet & adding new skylight well. | $25,000 |
| Sep 16, 2002 | Completed final sign-off Oct 2002 | 854 Clayton St | replacement of front windows with 10 vinyl white framed, double hunged in extg operingsDetails
replacement of front windows with 10 vinyl white framed, double hunged in extg operings | $5,500 | |
| Jan 12, 2000 | Expired or cancelled expired Aug 2000 | 854 Clayton St | Goffo Construction Inc | insulate attic rafters & sheetrock, repair water damage window trim at rear,replace 2 windowsDetails
insulate attic rafters & sheetrock, repair water damage window trim at rear,replace 2 windows |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Thomson Fabrication And Design (2), Aileron Builders, Casa Utopia Builders Inc, Goffo Construction Inc
- Architects
- Cassandra Mettling Davis
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.