Agape Construction
- Based in
- So. San Francisco
- On San Francisco permits
- Sep 2006 to Oct 2007
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 29 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2006 | Completed final sign-off Oct 2006 | 550 Belvedere St | comply nov 200669879.repair side&rear exterior wood stairs.less than 50% of structure. provide handrails at the side exterior concrete stairs &the rear exterior wood stairs.remove the lock from the door separating the side passageway&the rear yard.install an automatic door closer on front side door.Details
comply nov 200669879.repair side&rear exterior wood stairs.less than 50% of structure. provide handrails at the side exterior concrete stairs &the rear exterior wood stairs.remove the lock from the door separating the side passageway&the rear yard.install an automatic door closer on front side door. | $3,500 |