Afz Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2003 to Dec 2013
- Last 24 months
- 0 permits filed
24 permits since 2000: 23 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 1 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2011 | Completed final sign-off Mar 2012 | 1839 26th Av | remodel gound floor: add bedroom, full bath & storage room. add deck & stairs at back @ 2nd floor. replace all windows w/vinyl type.Details
remodel gound floor: add bedroom, full bath & storage room. add deck & stairs at back @ 2nd floor. replace all windows w/vinyl type. | $50,000 |
| Dec 17, 2010 | Completed final sign-off Apr 2011 | 2475 Vallejo St | to comply with physical inspection report cc-5726; item 9 of 2477 vallejo st, remove (e) illegal deck and provide security guard rail bar per sec 1013.3, max 4" spacing, electrical work under separate permitDetails
to comply with physical inspection report cc-5726; item 9 of 2477 vallejo st, remove (e) illegal deck and provide security guard rail bar per sec 1013.3, max 4" spacing, electrical work under separate permit | $6,000 |
| Aug 3, 2010 | Completed final sign-off Dec 2010 | 508 45th Av | repair/replace dry-rot siding in kind @ south and east side of bldg, replace kitchen cabinet, counter top & bathtop, sink, toilet at #508, replace aluminum windows @ side & rear with vinyl windows, repair (e) rotted deck @ back of house, front windows to be replaced wood-clad to match (e).Details
repair/replace dry-rot siding in kind @ south and east side of bldg, replace kitchen cabinet, counter top & bathtop, sink, toilet at #508, replace aluminum windows @ side & rear with vinyl windows, repair (e) rotted deck @ back of house, front windows to be replaced wood-clad to match (e). | $23,000 |