Back to bathroom remodel contractors
Afz Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2003 to Dec 2013
- Last 24 months
- 0 permits filed
24 permits since 2000: 23 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 0 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 18, 2012 | Completed final sign-off Aug 2013 | 2475 Vallejo St | relocate half bath in 3rd fl and laundry room in 2nd fl per plan. install new insulation for all exterior walls and ceiling. install new sheetrock for all inside walls and ceiling. instll new foundation in unit 2474 vallejo. master bath area. install new plywood per plan for shear wall.Details
relocate half bath in 3rd fl and laundry room in 2nd fl per plan. install new insulation for all exterior walls and ceiling. install new sheetrock for all inside walls and ceiling. instll new foundation in unit 2474 vallejo. master bath area. install new plywood per plan for shear wall. | $45,000 |
| Mar 30, 2012 | Completed final sign-off Aug 2013 | 2475 Vallejo St | remodel 2 kitchen, 4 full bathroom, 2 half bath per plan. relocate walls and door per plan. install 4 new windows in back of bldg per plan. replace dry rotted wood in stair at light well area.Details
remodel 2 kitchen, 4 full bathroom, 2 half bath per plan. relocate walls and door per plan. install 4 new windows in back of bldg per plan. replace dry rotted wood in stair at light well area. | $150,000 |
| Feb 13, 2012 | Completed final sign-off Oct 2012 | 42 Fortuna Av | remodel 1 bathroom at 2/f, 1 bathroom at 3/f. existing wall to remain without modification.Details
remodel 1 bathroom at 2/f, 1 bathroom at 3/f. existing wall to remain without modification. | $25,000 |
| Dec 16, 2011 | Completed final sign-off Mar 2012 | 1839 26th Av | remodel gound floor: add bedroom, full bath & storage room. add deck & stairs at back @ 2nd floor. replace all windows w/vinyl type.Details
remodel gound floor: add bedroom, full bath & storage room. add deck & stairs at back @ 2nd floor. replace all windows w/vinyl type. | $50,000 |
| Dec 9, 2011 | Completed final sign-off Mar 2012 | 1839 26th Av | remodel (1) kitchen, 1 bathroom. no new lighting. replace new vinyl window in back. replace aluminum window to wood window in front bedroom. mx u factor 0.4Details
remodel (1) kitchen, 1 bathroom. no new lighting. replace new vinyl window in back. replace aluminum window to wood window in front bedroom. mx u factor 0.4 | $35,000 |
| Dec 9, 2011 | Completed final sign-off May 2012 | 380 Rolph St | remodel 1st fl, add storage and laundry, closet and 1/2 bath. remodel 2nd fl kitchen and bath.Details
remodel 1st fl, add storage and laundry, closet and 1/2 bath. remodel 2nd fl kitchen and bath. | $30,000 |
| Jul 14, 2011 | Completed final sign-off Oct 2011 | 867 Peralta Av | replace aluminum windows for fonrt and back of house with vinyl. replace 1 kitchen cabinet and counter top. replace 2 bath tub and fixture. install new tile for kitchen floor and bathroom floor and wall.Details
replace aluminum windows for fonrt and back of house with vinyl. replace 1 kitchen cabinet and counter top. replace 2 bath tub and fixture. install new tile for kitchen floor and bathroom floor and wall. | $48,000 |
| Dec 31, 2010 | Completed final sign-off Apr 2011 | 126 Gillette Av | add (n) bedrooms & bathroom at first floor.replace 4 windows at 2nd floor, front and rear.Details
add (n) bedrooms & bathroom at first floor.replace 4 windows at 2nd floor, front and rear. | $20,000 |
| Dec 6, 2010 | Completed final sign-off May 2011 | 535 Visitacion Av | remodel kitchen & 1 bathroom.Details
remodel kitchen & 1 bathroom. | $20,000 |
| Dec 1, 2010 | Completed final sign-off Jan 2011 | 700 Goettingen St | replace all existing aluminum windows with vinyl windows. replace kitchen sink & counter top. replace bathroom sink & fixture.Details
replace all existing aluminum windows with vinyl windows. replace kitchen sink & counter top. replace bathroom sink & fixture. | $35,000 |