Back to kitchen remodel contractors
Aero Living Inc
- Based in
- San Jose
- On San Francisco permits
- Aug 2024 to Feb 2026
- Last 24 months
- 30 permits filed
32 permits since 2000: 19 completed, 11 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 11 completed, 4 in progress. Typically 23 days from filing to permit and 280 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2026 | Completed final sign-off Feb 2026 | 663 28th Av | revision to 202504094053: change kitchen layout to reflect final layout, reduce skylights at hallway from 3 to 2. no fixture count changesDetails
revision to 202504094053: change kitchen layout to reflect final layout, reduce skylights at hallway from 3 to 2. no fixture count changes | |
| Dec 4, 2025 | Completed final sign-off Mar 2026 | 14 Jules Av | remodel kitchen and bathrooms 1 & 2. keep the same location. convert (e) garage storage 110 sqft into new offices.Details
remodel kitchen and bathrooms 1 & 2. keep the same location. convert (e) garage storage 110 sqft into new offices. | $60,000 |
| Oct 28, 2025 | Completed final sign-off Sep 2026 | 10 Westwood Dr | revision to 202504235087; 1st floor revise layout of previously approved bathroom #3, 4, and bedroom #3, 4. 2nd flr: revise layout of previousley approved kitchen and bathroom #1.Details
revision to 202504235087; 1st floor revise layout of previously approved bathroom #3, 4, and bedroom #3, 4. 2nd flr: revise layout of previousley approved kitchen and bathroom #1. | $50,000 |
| Sep 10, 2025 | In progress filed Sep 2025, not yet issued | 10 Westwood Dr | revision to pa# 202504255087: remove 8 windows at kitchen. redisgn bath #1 and w.i.c.Details
revision to pa# 202504255087: remove 8 windows at kitchen. redisgn bath #1 and w.i.c. | |
| Jun 27, 2025 | Completed final sign-off Mar 2026 | 9 Clairview Ct | convert portion of garage to habitable space on 1st floor. to add 2 bedrooms, 2 bathrooms, media room and laundry. remodel existing kitchen and bathroom on 2nd floor and add 1 bathroom & closets, remove wall between living room and kitchen.Details
convert portion of garage to habitable space on 1st floor. to add 2 bedrooms, 2 bathrooms, media room and laundry. remodel existing kitchen and bathroom on 2nd floor and add 1 bathroom & closets, remove wall between living room and kitchen. | $100,000 |
| Jun 26, 2025 | Completed final sign-off Jul 2026 | 1887 30th Av | revision to 202501228802. remove structural walls between kitchen and living room, reframe the stairs, adjust structural posts. replace 4 windows with same opening in the front.Details
revision to 202501228802. remove structural walls between kitchen and living room, reframe the stairs, adjust structural posts. replace 4 windows with same opening in the front. | $10,000 |
| May 7, 2025 | In progress issued Nov 2025 | 1055 Alabama St | revision to pa 2205 0328 3256. adds 2nd fl rnvtn, new mstr bath, move bath 1, move kitchen w/ new skylight. elec upgrade, add garage, & relocate bedroom at lower level. (n) siding at front and relocate stairs at front. relocate driveway & driveway approaching. reusurface walkway damage by tree.Details
revision to pa 2205 0328 3256. adds 2nd fl rnvtn, new mstr bath, move bath 1, move kitchen w/ new skylight. elec upgrade, add garage, & relocate bedroom at lower level. (n) siding at front and relocate stairs at front. relocate driveway & driveway approaching. reusurface walkway damage by tree. | $175,000 |
| Apr 30, 2025 | In progress issued Jun 2025 | 2107 39th Av | 1st fl: convert partial garage to office & media room. relocate laundry, replace furnace & water heater. (e) bath #1 renovation. no sleeeping on 1st floor. 2nd fl: kitchen renovation, bath #2 renovation. replace window at living room, (e) bedroom 3 renovationDetails
1st fl: convert partial garage to office & media room. relocate laundry, replace furnace & water heater. (e) bath #1 renovation. no sleeeping on 1st floor. 2nd fl: kitchen renovation, bath #2 renovation. replace window at living room, (e) bedroom 3 renovation | $185,000 |
| Apr 28, 2025 | Completed final sign-off May 2026 | 67 Clairview Ct | remodel (e) workroom to convert to rooms down w/ media room, bedroom, bathroom, half bath & laundry. remodel (e) kitchen & 2 bathrooms, remove hall closets & remove wall between living room & kitchen.Details
remodel (e) workroom to convert to rooms down w/ media room, bedroom, bathroom, half bath & laundry. remodel (e) kitchen & 2 bathrooms, remove hall closets & remove wall between living room & kitchen. | $100,000 |
| Apr 23, 2025 | Completed final sign-off Sep 2026 | 10 Westwood Dr | 1/f: convert workshop, office and game room to new utility room, bedroom #3 and #4, bathroom #3 and #4 and media room. new furnace and water heater. 2/f: kitchen, bedrooms, and baths renovation. replace all windows in kind. lighting upgrade entire house.Details
1/f: convert workshop, office and game room to new utility room, bedroom #3 and #4, bathroom #3 and #4 and media room. new furnace and water heater. 2/f: kitchen, bedrooms, and baths renovation. replace all windows in kind. lighting upgrade entire house. | $185,000 |
| Apr 9, 2025 | Completed final sign-off Mar 2026 | 663 28th Av | replace e) windows at 2nd & 3rd fl. bath #1 renovation, n) bath #2 & #3. relocate kitchen, new office #3. 3 new skylights @ hallway. all work at 2nd flDetails
replace e) windows at 2nd & 3rd fl. bath #1 renovation, n) bath #2 & #3. relocate kitchen, new office #3. 3 new skylights @ hallway. all work at 2nd fl | $125,000 |
| Feb 14, 2025 | In progress issued Mar 2025 | 75 Knollview Wy | interior remodel and convert portion of garage to habitable space on 1st floor. adding family room, bedroom and full bathroom on 1st floor. interior remodel of an (e) kitchen and (e) bathrooms on 2nd floor.Details
interior remodel and convert portion of garage to habitable space on 1st floor. adding family room, bedroom and full bathroom on 1st floor. interior remodel of an (e) kitchen and (e) bathrooms on 2nd floor. | $221,264 |
| Jan 22, 2025 | Completed final sign-off Jul 2026 | 1887 30th Av | convert part of basement to living space to add 2 bedrooms and 2 baths. remodel kitchen and bath and add bathroom upstairs. rewire the wholehouse.Details
convert part of basement to living space to add 2 bedrooms and 2 baths. remodel kitchen and bath and add bathroom upstairs. rewire the wholehouse. | $160,000 |
| Dec 19, 2024 | Completed final sign-off Jul 2025 | 115 Gladeview Wy | interior remodel and convert portion of garage to habitable space. adding a family room, bedroom & full bath; 2nd fl - remodel existing kitchen & remodel 2 existing bathroomscDetails
interior remodel and convert portion of garage to habitable space. adding a family room, bedroom & full bath; 2nd fl - remodel existing kitchen & remodel 2 existing bathroomsc | $220,000 |
| Aug 12, 2024 | Completed final sign-off Feb 2025 | 147 Gladeview Wy | at 1/f: remodel (e) work shop space into (n) bedroom, remodel (e) laundry and (e) bathroom. at 2/f remodel (e) kitchen and (e) bathrooms.Details
at 1/f: remodel (e) work shop space into (n) bedroom, remodel (e) laundry and (e) bathroom. at 2/f remodel (e) kitchen and (e) bathrooms. | $98,000 |