Back to kitchen remodel contractors
Advanced Design General Contractor
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Dec 2024
- Last 24 months
- 1 permit filed
104 permits since 2000: 76 completed, 8 never finaled, 20 expired or cancelled.
Of the 8 never-finaled permits, 4 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 13 completed, 5 expired or cancelled. Typically 0 days from filing to permit and 215 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2024 | Completed final sign-off Aug 2024 | 1417 05th Av | replace walls and ceiling due to damage at unit #1417a at middle floor. renovate kitchen (10'x10'), renovate bathroom(7'x8'). change bath and kitchen windows. existing street facing windows to be replaced in kind. replace high-efficient furnace, less than 25' of new ductwork. ceiling 2-layer 5/8"Details
replace walls and ceiling due to damage at unit #1417a at middle floor. renovate kitchen (10'x10'), renovate bathroom(7'x8'). change bath and kitchen windows. existing street facing windows to be replaced in kind. replace high-efficient furnace, less than 25' of new ductwork. ceiling 2-layer 5/8" | $22,000 |
| Dec 5, 2023 | Completed final sign-off May 2026 | 1843 43rd Av | remodel (e) kitchen & bathroom, add new bathroom on 2/f, replace (e) wh and furnace. replace (2) skylights in kind and add one skylight.Details
remodel (e) kitchen & bathroom, add new bathroom on 2/f, replace (e) wh and furnace. replace (2) skylights in kind and add one skylight. | $95,000 |
| Jan 27, 2022 | Completed final sign-off Aug 2022 | 383 Bartlett St | interior remodel of the existing top floor dwelling unit to include a kitchen and bath remodel, and conversion of the existing utility room into a new bath.Details
interior remodel of the existing top floor dwelling unit to include a kitchen and bath remodel, and conversion of the existing utility room into a new bath. | $85,000 |
| Jun 29, 2018 | Expired or cancelled expired Nov 2024 | 3922 Kirkham St | horizontal addition at rear of building at 1st & 2nd floor. (n) deck to the north at 2/fl. (n) kitchen, bathroom, & laundry. plumbing, electrical & structural work as req.Details
horizontal addition at rear of building at 1st & 2nd floor. (n) deck to the north at 2/fl. (n) kitchen, bathroom, & laundry. plumbing, electrical & structural work as req. | $125,000 |
| Mar 16, 2018 | Expired or cancelled expired Apr 2023 | 60 13th St | abatement of nov#20183671, remove (e)mezzanine, bar & ground fl toilet with shower. legalize laundry sink, water heater, and second fl toilet room & kitchenette. convert portion of (e) 2nd fl area to accessory office use and accessory occupancy group b.Details
abatement of nov#20183671, remove (e)mezzanine, bar & ground fl toilet with shower. legalize laundry sink, water heater, and second fl toilet room & kitchenette. convert portion of (e) 2nd fl area to accessory office use and accessory occupancy group b. | $39,577 |
| Mar 24, 2015 | Completed final sign-off Feb 2016 | 420 Carl St | replace kitchen cabinets. electrical survey/small kitchen.Details
replace kitchen cabinets. electrical survey/small kitchen. | $7,000 |
| Nov 18, 2013 | Expired or cancelled expired May 2019 | 1395 Church St | in response to nov#201149988. occupancy change to residential "3892 26th street". proposed dining/living and bedrooms. same kitchen and bath. also, to add 1-layer of 5/8" type-x sheetrock to the residential side of the wall separating the restaurant.Details
in response to nov#201149988. occupancy change to residential "3892 26th street". proposed dining/living and bedrooms. same kitchen and bath. also, to add 1-layer of 5/8" type-x sheetrock to the residential side of the wall separating the restaurant. | |
| Sep 27, 2011 | Expired or cancelled expired Sep 2013 | 447 Carl St | replace kitchen cabinets and countertops (same location); install new electrical circuits; relocate stove approximate 2' over. replace (e) skylight. install new direct vent heater in living room. remodel bathroom (fixtures in the same location). no window, door work on this permit.Details
replace kitchen cabinets and countertops (same location); install new electrical circuits; relocate stove approximate 2' over. replace (e) skylight. install new direct vent heater in living room. remodel bathroom (fixtures in the same location). no window, door work on this permit. | $15,000 |
| Jun 6, 2011 | Completed final sign-off Aug 2011 | 449 Carl St | replace kitchen cabinets and countertops, new electrical, relocate faucet to deck , relocate stoveDetails
replace kitchen cabinets and countertops, new electrical, relocate faucet to deck , relocate stove | $9,500 |
| Jul 1, 2010 | Completed final sign-off Jun 2011 | 1575 20th Av | replace kitchen countertops only. no other work.Details
replace kitchen countertops only. no other work. | $3,900 |
| Nov 16, 2009 | Expired or cancelled expired Jan 2012 | 1663 Oak St | to acomply with physical inspection report # cc-5630. item # 8. removed non-bearing wall between kitchen & dining area on 3rd floor unit.Details
to acomply with physical inspection report # cc-5630. item # 8. removed non-bearing wall between kitchen & dining area on 3rd floor unit. | |
| Apr 3, 2008 | Completed final sign-off Feb 2009 | 731 44th Av | remodel includes: new kitchen, 2 new bathrooms, new partitions, roof framing, new basement space (excavate & foundation). new heat and hot water systems. (n) windows & doors, (n) ext. stucco finish.Details
remodel includes: new kitchen, 2 new bathrooms, new partitions, roof framing, new basement space (excavate & foundation). new heat and hot water systems. (n) windows & doors, (n) ext. stucco finish. | $181,000 |
| Feb 11, 2008 | Completed final sign-off Jul 2008 | 1255 California St | replace kitchen cabinets, counter tops. no change to location of cabinets or appliancesDetails
replace kitchen cabinets, counter tops. no change to location of cabinets or appliances | $20,000 |
| Sep 28, 2005 | Completed final sign-off Nov 2006 | 1967 29th Av | remodel kitchen, baths, add 2 new baths, 2 bedrooms.Details
remodel kitchen, baths, add 2 new baths, 2 bedrooms. | $85,000 |
| Mar 25, 2005 | Completed final sign-off Jun 2005 | 2468 Broadway | replace 8 windows with dual pane, not visable from street, reface kitchen cabinetsDetails
replace 8 windows with dual pane, not visable from street, reface kitchen cabinets | $14,000 |
| Jan 28, 2005 | Completed final sign-off Jun 2005 | 2464 Broadway | replace kitchen counter and cabinets./upgrade side & back windows to double glazed. front window toDetails
replace kitchen counter and cabinets./upgrade side & back windows to double glazed. front window to | $18,000 |
| Oct 25, 2004 | Completed final sign-off May 2005 | 2550 31st Av | install 1 bath, remodel kitchen, remodel 1 bath, (n) skylightDetails
install 1 bath, remodel kitchen, remodel 1 bath, (n) skylight | $37,500 |
| Sep 20, 2002 | Completed final sign-off Jun 2003 | 180 Downey St | remodel kitchen & both baths. reconstruct stairway for clearances. continuation of #200207302697 &Details
remodel kitchen & both baths. reconstruct stairway for clearances. continuation of #200207302697 & | $25,000 |