Back to kitchen remodel contractors
Adonis Building And Electrical
- Based in
- Walnut Creek
- On San Francisco permits
- Oct 2013 to Jun 2021
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 39 days from filing to permit and 474 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2021 | Completed final sign-off Apr 2024 | 774 45th Av | 1st fl: add a bathroom. 2nd fl: remodel (e) kitchen & bathroom, add a laundry room. 3rd fl: add a bathroom; replace (e) front windows in-kind.Details
1st fl: add a bathroom. 2nd fl: remodel (e) kitchen & bathroom, add a laundry room. 3rd fl: add a bathroom; replace (e) front windows in-kind. | $90,000 |
| Feb 3, 2014 | Completed final sign-off Jan 2015 | 4070 23rd St | comply w/nov #201448152 & 201447852 -retrofit (e) kitchen & bath @ 1st flr. add 1 bath, 1 bedrm, media to ground flr along w/adding partition for office space. add 6 dormers & strengthen roof, repour/repair foundationDetails
comply w/nov #201448152 & 201447852 -retrofit (e) kitchen & bath @ 1st flr. add 1 bath, 1 bedrm, media to ground flr along w/adding partition for office space. add 6 dormers & strengthen roof, repour/repair foundation | $80,000 |
| Oct 11, 2013 | Completed final sign-off Jan 2015 | 4070 23rd St | remodel 2 bathrooms and kitchen (same locations) - replace all elec. wirings and or legalize existing. replace all plumbing in the bldg.Details
remodel 2 bathrooms and kitchen (same locations) - replace all elec. wirings and or legalize existing. replace all plumbing in the bldg. | $40,000 |