Adler Builders Inc
- Based in
- Sunnyvale
- On San Francisco permits
- May 2024 to Jul 2026
- Last 24 months
- 13 permits filed
17 permits since 2000: 11 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Roof deck permits
1 roof deck permit: 1 in progress. Typically 162 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 7, 2026 | In progress issued Nov 2026 | 65 Loraine Ct | interior remodel w/ added roof deck set back 17'-10"from(e)facade.remodel includes a 2'-11" expansion on the 1st fl not extending beyond(e)floor above(n) elec,plum, structural,skylights,& interior finishes.maximum excavation 1'-6",total soil disturbance 12.8 cubic yards for foundation reinforcement.Details
interior remodel w/ added roof deck set back 17'-10"from(e)facade.remodel includes a 2'-11" expansion on the 1st fl not extending beyond(e)floor above(n) elec,plum, structural,skylights,& interior finishes.maximum excavation 1'-6",total soil disturbance 12.8 cubic yards for foundation reinforcement. | $300,000 |