Back to kitchen remodel contractors
Adam's Construction & Painting
- Based in
- San Francisco
- On San Francisco permits
- Nov 2006 to May 2018
- Last 24 months
- 0 permits filed
16 permits since 2000: 10 completed, 6 never finaled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 1, 2018 | Completed final sign-off Aug 2018 | 101 Lombard St | unit 712w: kitchen remodel, new appliances, cabinets, 9 recessed led lights, new countertops, dryer booster fan. remove 2 non-load bearing walls.Details
unit 712w: kitchen remodel, new appliances, cabinets, 9 recessed led lights, new countertops, dryer booster fan. remove 2 non-load bearing walls. | $15,000 |
| Nov 30, 2015 | Completed final sign-off Mar 2016 | 101 Lombard St | kitchen and bathroom remodel: change cabinets, counter top, 6 recessed lights, new appliances, tile floor, new vanity cabinet, recessed light, new counter top, tile, tub surround and floor, new exhaust fan. change single sink to double sink, shower valve.Details
kitchen and bathroom remodel: change cabinets, counter top, 6 recessed lights, new appliances, tile floor, new vanity cabinet, recessed light, new counter top, tile, tub surround and floor, new exhaust fan. change single sink to double sink, shower valve. | $20,000 |
| Jul 8, 2013 | Completed final sign-off Sep 2013 | 101 Lombard St | apt #415w-1 kitchen & 2 bathroom remodels-new shower valves, painting. kitchen cabinets, flooring, appliances, sink & faucet, tile surroundDetails
apt #415w-1 kitchen & 2 bathroom remodels-new shower valves, painting. kitchen cabinets, flooring, appliances, sink & faucet, tile surround | $33,744 |
| Apr 8, 2013 | Never finaled issued Apr 2013, no final | 1333 Jones St | remodel kitchen - foot print staying the same, electrical pulled his own permit online, lighting shall comply w/t-24.Details
remodel kitchen - foot print staying the same, electrical pulled his own permit online, lighting shall comply w/t-24. | $3,500 |
| Nov 14, 2011 | Completed final sign-off Apr 2012 | 101 Lombard St | kitchen and bathroom remodel, re frame 3 partial walls, recessed lighting, new shower valve, carpet painting etc.Details
kitchen and bathroom remodel, re frame 3 partial walls, recessed lighting, new shower valve, carpet painting etc. | $25,000 |