Adam Knowles Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Apr 2014
- Last 24 months
- 0 permits filed
16 permits since 2000: 9 completed, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 never finaled. Typically 2 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2014 | Never finaled issued May 2014, no final | 142 20th Av | partial int remodel e. top 4th fl. replacement roof framing and waterproof roofing at 4th fl. replace e roof deck framing with ipe roof deck surface, in kind replacement of e windows at 4th fl. no additonal square footage. no vertical/horizontal additionsDetails
partial int remodel e. top 4th fl. replacement roof framing and waterproof roofing at 4th fl. replace e roof deck framing with ipe roof deck surface, in kind replacement of e windows at 4th fl. no additonal square footage. no vertical/horizontal additions | $45,000 |