Back to kitchen remodel contractors
Act General Building Construction
- Based in
- Oakland
- On San Francisco permits
- Mar 2006 to Jun 2012
- Last 24 months
- 0 permits filed
21 permits since 2000: 19 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 76 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2011 | Completed final sign-off Sep 2011 | 2673 Filbert St | kitchen remodel: install new cabinets, new gfi outlets, garbage disposal, dishwasher, ceramic tiles, bathrm remodel- new floor & walls tiles, & gfi, fan ext. no structural work replace in kindDetails
kitchen remodel: install new cabinets, new gfi outlets, garbage disposal, dishwasher, ceramic tiles, bathrm remodel- new floor & walls tiles, & gfi, fan ext. no structural work replace in kind | $15,500 |
| Jun 1, 2009 | Completed final sign-off Jul 2009 | 215 Evelyn Wy | rplace cabinet, floor, painting, 2 new circuits in kitchen areaDetails
rplace cabinet, floor, painting, 2 new circuits in kitchen area | $10,000 |
| Oct 1, 2008 | Completed final sign-off Mar 2009 | 2049 Leavenworth St | kitchen remodel/remove & install new cabinets and appliances, new electric circuits,install new washer/dryer,tankless water heater, retrofit window in kind door, recessed lights,no new wall cosntructionDetails
kitchen remodel/remove & install new cabinets and appliances, new electric circuits,install new washer/dryer,tankless water heater, retrofit window in kind door, recessed lights,no new wall cosntruction | $45,000 |
| Apr 2, 2007 | Completed final sign-off May 2007 | 396 Los Palmos Dr | kitchen remodel, new cabinet, new appliances and floorDetails
kitchen remodel, new cabinet, new appliances and floor | $10,000 |