Acon Group
- Based in
- San Francisco
- On San Francisco permits
- Dec 2005 to Oct 2014
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 36 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2006 | Completed final sign-off Feb 2007 | 4901 17th St | to comply with 3r-4509: remove lock/replace on front gate, replace deadbolts with approved locking devices, remove wood frame & fiberglass shelter over rear stair court. install lights common rear stairs, separate common area circuit, install shut-off valve on kitchen sink (4903).Details
to comply with 3r-4509: remove lock/replace on front gate, replace deadbolts with approved locking devices, remove wood frame & fiberglass shelter over rear stair court. install lights common rear stairs, separate common area circuit, install shut-off valve on kitchen sink (4903). | $3,500 |