Back to kitchen remodel contractors
Abstract Windows Inc.
- Based in
- Belmont
- On San Francisco permits
- Feb 2014 to Oct 2026
- Last 24 months
- 50 permits filed
527 permits since 2000: 358 completed, 4 in progress, 153 never finaled, 12 expired or cancelled.
Of the 153 never-finaled permits, 24 are 3 to 5 years old, 106 are 5 to 10 years old, 23 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 0 days from filing to permit and 212 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 18, 2024 | Completed final sign-off Oct 2025 | 1672 Dolores St | unit #3: to comply with complaint #202316501, installation of new sink and cabinets in the kitchen and new sink cabinet, also new vanity in the bathroom like for like. to comply with 202044411Details
unit #3: to comply with complaint #202316501, installation of new sink and cabinets in the kitchen and new sink cabinet, also new vanity in the bathroom like for like. to comply with 202044411 | $15,000 |
| Sep 29, 2023 | Completed final sign-off Apr 2024 | 374 Vienna St | replace (11) windows, 6 are front facade to be impervia fiberglass, and (1) door with retrofit fiberglass windows. (2) windows in kitchen and (1) door. nail fin installation. visible from street. u factor less than or equal to 0.30.Details
replace (11) windows, 6 are front facade to be impervia fiberglass, and (1) door with retrofit fiberglass windows. (2) windows in kitchen and (1) door. nail fin installation. visible from street. u factor less than or equal to 0.30. | $18,900 |
| May 12, 2022 | Completed final sign-off Apr 2023 | 1906 Hyde St | unit 6: (2) windows like for like: retrofit install kitchen side of the house street visible - (e) wood (n) wood single hung with sash lugsDetails
unit 6: (2) windows like for like: retrofit install kitchen side of the house street visible - (e) wood (n) wood single hung with sash lugs | $2,700 |
| Apr 23, 2021 | Completed final sign-off Feb 2022 | 1962 19th Av | total 24 windows replacement in kind. replace 5 windows in front of the house and/ windws in back. like for like retrfit. front. front windows will be wood. 5 living room. 4 bedroom, 2 bathroom, 1 kitchen, 6 other room. no rough oepning change u factor not to exceed 0.30Details
total 24 windows replacement in kind. replace 5 windows in front of the house and/ windws in back. like for like retrfit. front. front windows will be wood. 5 living room. 4 bedroom, 2 bathroom, 1 kitchen, 6 other room. no rough oepning change u factor not to exceed 0.30 | $15,100 |
| Oct 6, 2020 | Completed final sign-off Mar 2021 | 158 11th Av | replace (e) windows with marvin wod windows with alum cladding with same size at 2/f: (1) kitchen window & (1) bathroom window facing rear yard at 3/f: (6) windows at bedrooms facing 11th ave. bathroom windows facing lightwell & (2) bedroom windows facing rear yardDetails
replace (e) windows with marvin wod windows with alum cladding with same size at 2/f: (1) kitchen window & (1) bathroom window facing rear yard at 3/f: (6) windows at bedrooms facing 11th ave. bathroom windows facing lightwell & (2) bedroom windows facing rear yard | $16,000 |
| Aug 14, 2020 | Completed final sign-off Jun 2021 | 1347 05th Av | replace kitchen windows on 2 units(breezeway) 6 windows - not visible from street.Details
replace kitchen windows on 2 units(breezeway) 6 windows - not visible from street. | $6,000 |
| Feb 28, 2020 | Completed final sign-off Jun 2020 | 4566 18th St | remodel kitchen: cabinets, new sink, new lights. all in kindDetails
remodel kitchen: cabinets, new sink, new lights. all in kind | $10,000 |
| Jul 3, 2014 | Completed final sign-off Aug 2014 | 633 Spruce St | replacing french door & kitchen window. not street visible.Details
replacing french door & kitchen window. not street visible. | $2,800 |