Permit GraphShortlistSan Francisco building permits since 2000

Above And Beyond Construction

Contractor license
841778
State license record
Based in
Richmond
On San Francisco permits
Sep 2006 to Sep 2011
Last 24 months
0 permits filed

6 permits since 2000: 3 completed, 1 never finaled, 2 expired or cancelled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllDeck 1Stairs 2Bathroom remodel 1

2 stairs permits: 1 completed, 1 expired or cancelled. Typically 53 days from filing to permit and 67 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
May 28, 2009Completed
final sign-off Nov 2009
43 Latona Stto comply with nov #200879068 to reconstruct existing rear stairs and add 12 sq. ft. to deck.
Details
Permit
200905289283
Status
complete
Filed
May 28, 2009
Permit issued
Sep 11, 2009
Final sign-off
Nov 17, 2009
Declared cost
$5,000
Address
43 Latona St

to comply with nov #200879068 to reconstruct existing rear stairs and add 12 sq. ft. to deck.

Open the permit page

$5,000
Aug 6, 2008Expired or cancelled
expired Apr 2010
43 Latona Streplace back steps to ground from top down, replace front steps (10 total), replace dry rot post and railaing, not to exceed 50% of total stairs
Details
Permit
200808068521
Status
expired
Filed
Aug 6, 2008
Permit issued
Aug 6, 2008
Declared cost
$10,000
Address
43 Latona St

replace back steps to ground from top down, replace front steps (10 total), replace dry rot post and railaing, not to exceed 50% of total stairs

Open the permit page

$10,000