Above And Beyond Construction
- Based in
- Richmond
- On San Francisco permits
- Sep 2006 to Sep 2011
- Last 24 months
- 0 permits filed
6 permits since 2000: 3 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 expired or cancelled. Typically 53 days from filing to permit and 67 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 28, 2009 | Completed final sign-off Nov 2009 | 43 Latona St | to comply with nov #200879068 to reconstruct existing rear stairs and add 12 sq. ft. to deck.Details
to comply with nov #200879068 to reconstruct existing rear stairs and add 12 sq. ft. to deck. | $5,000 |
| Aug 6, 2008 | Expired or cancelled expired Apr 2010 | 43 Latona St | replace back steps to ground from top down, replace front steps (10 total), replace dry rot post and railaing, not to exceed 50% of total stairsDetails
replace back steps to ground from top down, replace front steps (10 total), replace dry rot post and railaing, not to exceed 50% of total stairs | $10,000 |