Back to kitchen remodel contractors
Abbeyside Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2014 to Aug 2026
- Last 24 months
- 15 permits filed
26 permits since 2000: 14 completed, 9 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
7 kitchen remodel permits: 3 completed, 3 in progress, 1 expired or cancelled. Typically 124 days from filing to permit and 197 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2026 | In progress issued Sep 2026 | 657 Arguello Bl | horizontal addition and new 3rd flr expanision; expansion of conditined living space to 1/f with new bedroom, bath, exercise & media room; reconfigure 2/f with living/dining, kitchen, bath & study; & new 3/f with 3-bedrooms & 2-baths.Details
horizontal addition and new 3rd flr expanision; expansion of conditined living space to 1/f with new bedroom, bath, exercise & media room; reconfigure 2/f with living/dining, kitchen, bath & study; & new 3/f with 3-bedrooms & 2-baths. | $400,000 |
| Dec 30, 2025 | In progress issued Aug 2026 | 452 Fair Oaks St | rev 202504174627- relocate unit 454 from 2nd fl to 1st fl & reconfigure it w/ 2 bedrooms and 2 baths; expanding unit 452 into 2nd fl and reconfigure w/ 3 bedrooms and 3 baths, study , library & kitchen; (n) front door @ 1st fl. unit 454 - (n) rear landscape stair to yard....Details
rev 202504174627- relocate unit 454 from 2nd fl to 1st fl & reconfigure it w/ 2 bedrooms and 2 baths; expanding unit 452 into 2nd fl and reconfigure w/ 3 bedrooms and 3 baths, study , library & kitchen; (n) front door @ 1st fl. unit 454 - (n) rear landscape stair to yard.... | |
| Aug 20, 2025 | Completed final sign-off Mar 2026 | 1731 32nd Av | reconfigure existing bathroom and closet, add new bathroom, add new built in kitchen peninsula counter.Details
reconfigure existing bathroom and closet, add new bathroom, add new built in kitchen peninsula counter. | $38,000 |
| May 2, 2025 | In progress issued Nov 2025 | 452 Fair Oaks St | scope of work includes expanding unit 452 from 2nd fl to the 1st floor & reconfiguring it with 2 beds & two & 1/2 baths,kitchen,dining,library,& living areas,unit 454 reconfigured with 2 beds,3 baths,kitchen & dining room with roof deck & yard access stair,one story rear horizontal addition.Details
scope of work includes expanding unit 452 from 2nd fl to the 1st floor & reconfiguring it with 2 beds & two & 1/2 baths,kitchen,dining,library,& living areas,unit 454 reconfigured with 2 beds,3 baths,kitchen & dining room with roof deck & yard access stair,one story rear horizontal addition. | $300,000 |
| Feb 5, 2025 | Completed final sign-off Jun 2025 | 20 Ardenwood Wy | kitchen and bathroom remodel and add 1/2 bathroomDetails
kitchen and bathroom remodel and add 1/2 bathroom | $85,000 |
| Nov 18, 2021 | Completed final sign-off Jun 2022 | 127 Leroy Pl | replace kitchen and bathroom in each unit with new cabinets and fixutres and upgrade the elecrical and plumbing in these areas. no moving walls. in kind of existing.Details
replace kitchen and bathroom in each unit with new cabinets and fixutres and upgrade the elecrical and plumbing in these areas. no moving walls. in kind of existing. | $135,000 |
| Sep 15, 2014 | Expired or cancelled expired Oct 2021 | 2018 Webster St | renovation to (e) 4 story bldg add basement/garage level & a horiz add. up to the rear yard line for the 2/f & 3/f w/a 4/f deck each unit to have (n) kitchen.Details
renovation to (e) 4 story bldg add basement/garage level & a horiz add. up to the rear yard line for the 2/f & 3/f w/a 4/f deck each unit to have (n) kitchen. | $750,000 |