Back to kitchen remodel contractors
Aba General Construction Corp
- Based in
- Burlingame
- On San Francisco permits
- Jul 2016 to Apr 2021
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 259 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2020 | Completed final sign-off Apr 2021 | 75 Swiss Av | install new kitchen (65 sq ft) cabinets, new sink and faucets, new ceiling lights, new appliances. all are same location.Details
install new kitchen (65 sq ft) cabinets, new sink and faucets, new ceiling lights, new appliances. all are same location. | $15,000 |
| Dec 18, 2019 | Completed final sign-off Mar 2020 | 1619 48th Av | 2nd fl: replace kitchen cabinets and countertop.Details
2nd fl: replace kitchen cabinets and countertop. | $19,500 |
| May 7, 2019 | Completed final sign-off May 2020 | 1835 Franklin St | remodel kitchen & 2 bathrooms.Details
remodel kitchen & 2 bathrooms. | $32,000 |
| Jul 28, 2017 | Completed final sign-off May 2019 | 617 Rhode Island St | 1)remodel extg bathroom and relocate washer/dryer at lower floor. 2)remodel extg kitchen/bathroom. convert living room space to bedroom and re built extg interior staircase up to attic at 2nd floor. replace kitchen hood.Details
1)remodel extg bathroom and relocate washer/dryer at lower floor. 2)remodel extg kitchen/bathroom. convert living room space to bedroom and re built extg interior staircase up to attic at 2nd floor. replace kitchen hood. | $42,000 |
| Jul 21, 2016 | Completed final sign-off Nov 2016 | 179 Duncan St | to comply with violation 201618371; remodel 2 bathrooms (all same location)retile,new vanities,replace kitchen cabinets & countertop (same location), replace furnace.Details
to comply with violation 201618371; remodel 2 bathrooms (all same location)retile,new vanities,replace kitchen cabinets & countertop (same location), replace furnace. | $12,000 |