Aaa Builders
- Based in
- San Leandro
- On San Francisco permits
- Jan 2014 to Jan 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 2 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2014 | Never finaled issued May 2014, no final | 1776 Page St | shingle roof repair 2 squares (10'x21'), repair dry rot at front, repair rotten siding at rear, exterior wall (10'x12') above & below, repair dry rot wood on rear stairs less than 50%, mid-level window, 2 door replacement @ inteior, no change to layout.Details
shingle roof repair 2 squares (10'x21'), repair dry rot at front, repair rotten siding at rear, exterior wall (10'x12') above & below, repair dry rot wood on rear stairs less than 50%, mid-level window, 2 door replacement @ inteior, no change to layout. | $5,000 |