A2z Remodeling Inc.
- Based in
- Oakland
- On San Francisco permits
- Nov 2018 to Sep 2026
- Last 24 months
- 34 permits filed
72 permits since 2000: 44 completed, 19 in progress, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 completed, 1 in progress. Typically 320 days from filing to permit and 1326 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 25, 2024 | In progress issued Sep 2025 | 340 Baden St | new second story deck, replace 1st flr cement patio, replace bedroom window w/door with lights outside door.Details
new second story deck, replace 1st flr cement patio, replace bedroom window w/door with lights outside door. | $42,000 |
| Jan 17, 2023 | Completed final sign-off Apr 2024 | 4528 17th St | replace 1220 sf. drywall, 80x68 sliding dr, 300 sf.cement fiber siding, kitchen cabinets, countertops, tub splash in 1st flr bathrm. replace (1) toilet, (1) bath vanity 12 plugs, 6 light outlet, 6 switches, 2 inter doors. recoat 2 decks w/ flastower. replace handwood fl.to comply with nov# 202298635Details
replace 1220 sf. drywall, 80x68 sliding dr, 300 sf.cement fiber siding, kitchen cabinets, countertops, tub splash in 1st flr bathrm. replace (1) toilet, (1) bath vanity 12 plugs, 6 light outlet, 6 switches, 2 inter doors. recoat 2 decks w/ flastower. replace handwood fl.to comply with nov# 202298635 | $300,000 |
| Nov 9, 2018 | Completed final sign-off Aug 2026 | 162 27th Av | infill entry stair & (e) lightwells on sides of bldg. move stairs to inerior of bldg. vertical addition (3rd & rth stories) with (n) lightwell to match adjacent lightwell; deck expansion. 2nd story, (n) deck - 3rd storyDetails
infill entry stair & (e) lightwells on sides of bldg. move stairs to inerior of bldg. vertical addition (3rd & rth stories) with (n) lightwell to match adjacent lightwell; deck expansion. 2nd story, (n) deck - 3rd story | $150,000 |