Back to bathroom remodel contractors
A2z Remodeling Inc.
- Based in
- Oakland
- On San Francisco permits
- Nov 2018 to Sep 2026
- Last 24 months
- 34 permits filed
72 permits since 2000: 44 completed, 19 in progress, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
47 bathroom remodel permits: 27 completed, 13 in progress, 5 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 171 Parnassus Av | 2/f -conversion of existing living room area into master bedroom and bath inside single family condo. no change to landscape, parking, impervious area, drainage.Details
2/f -conversion of existing living room area into master bedroom and bath inside single family condo. no change to landscape, parking, impervious area, drainage. | $40,000 |
| Sep 1, 2026 | In progress issued Sep 2026 | 593 Texas St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $20,000 |
| Aug 24, 2026 | In progress issued Aug 2026 | 367 Collingwood St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $20,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 2169 Folsom St | unit m305: master bathroom remodel like for like. no structural changes, no removal of walls, replace toilet, vanity. upgrade mep to code as needed.Details
unit m305: master bathroom remodel like for like. no structural changes, no removal of walls, replace toilet, vanity. upgrade mep to code as needed. | $20,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 455 Scott St | unit#: 3;kitchen remodel and bathroom remodel including removal of ktichen wall (non structural) replace toilet and sink in the bathroom. replace kitchen sink, dishwasher in the kitchen. update m.e.p. to code as needed.Details
unit#: 3;kitchen remodel and bathroom remodel including removal of ktichen wall (non structural) replace toilet and sink in the bathroom. replace kitchen sink, dishwasher in the kitchen. update m.e.p. to code as needed. | $20,000 |
| Aug 7, 2026 | In progress issued Aug 2026 | 455 Scott St | unit #3: bathroom remodel - like for like. no structural changes, no walls removed, shower to shower, replace toilet, vanity sink, fan, and upgrade mep to code as needed. 40 sqft.Details
unit #3: bathroom remodel - like for like. no structural changes, no walls removed, shower to shower, replace toilet, vanity sink, fan, and upgrade mep to code as needed. 40 sqft. | $20,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 601 Urbano Dr | guest bathroom and kitchen remodel both like for like. bathroom remodel no sturctural changes replace tub, toilet, vanity and fan in same location of bathroom. upgrade mep to code as needed. kitchen remodel no structural changes. replace sink,counter tops, appliances and cabinetsDetails
guest bathroom and kitchen remodel both like for like. bathroom remodel no sturctural changes replace tub, toilet, vanity and fan in same location of bathroom. upgrade mep to code as needed. kitchen remodel no structural changes. replace sink,counter tops, appliances and cabinets | $30,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 3044 Ulloa St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $20,000 |
| May 28, 2026 | In progress issued May 2026 | 434 11th Av | kitchen and bathroom remodel like for like, rewire, new electrical and plumbing, replace fixtures, toilet, kitchen sink, bath vanity, upgrade mep to code. no removal of wallsDetails
kitchen and bathroom remodel like for like, rewire, new electrical and plumbing, replace fixtures, toilet, kitchen sink, bath vanity, upgrade mep to code. no removal of walls | $38,000 |
| Mar 27, 2026 | Completed final sign-off Aug 2026 | 199 Quintara St | create a 1/2 bath. no change in footprint.Details
create a 1/2 bath. no change in footprint. | $55,000 |
| Mar 9, 2026 | Completed final sign-off Aug 2026 | 199 Quintara St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $20,000 |
| Feb 3, 2026 | Completed final sign-off Jun 2026 | 4150 17th St | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s). | $30,000 |
| Jan 9, 2026 | In progress issued Jan 2026 | 54 Fernwood Dr | remodel the lower level and add a bathroom. no change to landscaping, parking, imprevious area and drainage.Details
remodel the lower level and add a bathroom. no change to landscaping, parking, imprevious area and drainage. | $35,000 |
| Jan 9, 2026 | Completed final sign-off Mar 2026 | 140 South Van Ness Av | unit 340: bathroom remodel, shower like for like, replace toilet, sink, vanity, shower, fan upgrade, mep to code 60 sq ft.Details
unit 340: bathroom remodel, shower like for like, replace toilet, sink, vanity, shower, fan upgrade, mep to code 60 sq ft. | $15,000 |
| Nov 24, 2025 | In progress issued Dec 2025 | 1206 18th St | revision to pa 202301120085 1st fl existing kitchenette to remain; 2nd fl - (n) laundry location, (e) wall at bathroom to be removed & replaced w/tempered glass wall & tempered glass door; move entry foyer door 12" over to the front of the bilding; 4th fl - convert(e) family room into a bedroomDetails
revision to pa 202301120085 1st fl existing kitchenette to remain; 2nd fl - (n) laundry location, (e) wall at bathroom to be removed & replaced w/tempered glass wall & tempered glass door; move entry foyer door 12" over to the front of the bilding; 4th fl - convert(e) family room into a bedroom | $2,000 |
| Sep 25, 2025 | In progress issued Aug 2026 | 129 Baker St | kitchen and bath remodel. demo (1) bath and add (1) bath and powder room to include (n) shower pan. reconfigure window openings at rear elevation, not visible from street.Details
kitchen and bath remodel. demo (1) bath and add (1) bath and powder room to include (n) shower pan. reconfigure window openings at rear elevation, not visible from street. | $40,000 |
| Mar 18, 2025 | Completed final sign-off Jun 2025 | 650 Carolina St | one complete bathroom remodel like for like no wall changes, shower pan, 100 sqft.Details
one complete bathroom remodel like for like no wall changes, shower pan, 100 sqft. | $25,000 |
| Nov 5, 2024 | Expired or cancelled expired May 2026 | 162 27th Av | comply with nov 202427744. revised structural work needed after new discovery at demolition. revision to pa# 201811095518. added bathroom remodel an interior layout changes. no change in height.Details
comply with nov 202427744. revised structural work needed after new discovery at demolition. revision to pa# 201811095518. added bathroom remodel an interior layout changes. no change in height. | |
| Oct 30, 2024 | Completed final sign-off Jan 2025 | 349 Dellbrook Av | complete bathroom remodel like for like. no walls removalDetails
complete bathroom remodel like for like. no walls removal | $25,000 |
| Oct 30, 2024 | Completed final sign-off Jun 2025 | 560 Hill St | 1 kitchen and 1 bathroom remodel in kind. like for like. no walls changesDetails
1 kitchen and 1 bathroom remodel in kind. like for like. no walls changes | $45,000 |
| May 15, 2024 | Completed final sign-off Dec 2024 | 340 Baden St | one kitchen remodel like for like and two bathroom remodels like for like. one shower pan.Details
one kitchen remodel like for like and two bathroom remodels like for like. one shower pan. | $40,000 |
| May 2, 2024 | Completed final sign-off Aug 2024 | 2651 15th Av | complete 2 bathroom remodel like for like, 2 shower pans, no walls or layout changes.Details
complete 2 bathroom remodel like for like, 2 shower pans, no walls or layout changes. | $40,000 |
| Mar 28, 2024 | Completed final sign-off Jul 2024 | 2516 Gough St | partial bathroom remodel, replace tub w/ showerDetails
partial bathroom remodel, replace tub w/ shower | $10,000 |
| Mar 14, 2024 | Completed final sign-off Jun 2024 | 1257 Noe St | one complete bathroom remodel like for like, no walls or layout changes tub to tub.Details
one complete bathroom remodel like for like, no walls or layout changes tub to tub. | $24,000 |
| Mar 5, 2024 | Completed final sign-off Jun 2024 | 1701 Jackson St | unit 708: one bathroom remodel like for like, no walls or layout changes, shower panDetails
unit 708: one bathroom remodel like for like, no walls or layout changes, shower pan | $25,000 |
| Feb 14, 2024 | Completed final sign-off Feb 2025 | 330 Cherry St | complete 2 bathroom remodels, 1 powder room, like for like and rewire for entire house. no walls or layouts alterations.Details
complete 2 bathroom remodels, 1 powder room, like for like and rewire for entire house. no walls or layouts alterations. | $50,000 |
| Sep 11, 2023 | Completed final sign-off Feb 2024 | 1226 02nd Av | complete bathroom remodel no walls change, canceling the shower and relocating toilet and vanity. replacing all el, pl, mech. all work is non-structural only.Details
complete bathroom remodel no walls change, canceling the shower and relocating toilet and vanity. replacing all el, pl, mech. all work is non-structural only. | $10,000 |
| Sep 11, 2023 | Completed final sign-off Dec 2023 | 49 Zoe St | remodel to (e) bathroom replace (e) with new bathroom fixtures & finises. no added heated space no changes of exterior envelope. no removal of interior partitions. shower panDetails
remodel to (e) bathroom replace (e) with new bathroom fixtures & finises. no added heated space no changes of exterior envelope. no removal of interior partitions. shower pan | $10,000 |
| Sep 6, 2023 | Completed final sign-off Apr 2024 | 4528 17th St | revision to 202301170261. remove bearing & non-bearing walls in the kitchen and provide a new kitchen cabinet layout including island, change (e) arched insulated glass/aluminum windows to new aluminum frames & install 4 new aluminum windows in office, remove non-load bearing wall in upstair bath &Details
revision to 202301170261. remove bearing & non-bearing walls in the kitchen and provide a new kitchen cabinet layout including island, change (e) arched insulated glass/aluminum windows to new aluminum frames & install 4 new aluminum windows in office, remove non-load bearing wall in upstair bath & | $40,000 |
| Aug 14, 2023 | Completed final sign-off Aug 2026 | 162 27th Av | revision to 201811095518. reduction in scope of work in which no 3rd fl addition in front of the house. retain infill entry stair but no lightwell change. retain 1st fl approved plans. retain 2nd fl kitchen but 2nd fl (e) bath change to two. retain 3rd fl master rd, master bath &Details
revision to 201811095518. reduction in scope of work in which no 3rd fl addition in front of the house. retain infill entry stair but no lightwell change. retain 1st fl approved plans. retain 2nd fl kitchen but 2nd fl (e) bath change to two. retain 3rd fl master rd, master bath & | |
| Jul 20, 2023 | Completed final sign-off Nov 2023 | 549 Staples Av | complete bathroom remodel like fo rlike w/ walk-in shower, no wall/layout changes. shower pan.Details
complete bathroom remodel like fo rlike w/ walk-in shower, no wall/layout changes. shower pan. | $25,000 |
| Jul 18, 2023 | Completed final sign-off Aug 2024 | 114 Edgewood Av | 1 kitchen & 2 bath reomdel. half bath addition. upgrade new appliances, fixtures & finishes. new sliding patio door. new skylights. replace (e) windows.Details
1 kitchen & 2 bath reomdel. half bath addition. upgrade new appliances, fixtures & finishes. new sliding patio door. new skylights. replace (e) windows. | $400,000 |
| Jul 6, 2023 | Completed final sign-off Feb 2024 | 229 Brannan St | complete 3 bathrooms and kitchen remodel like for like, no walls or layout changeDetails
complete 3 bathrooms and kitchen remodel like for like, no walls or layout change | $50,000 |
| Jun 8, 2023 | Completed final sign-off Jul 2023 | 171 Parnassus Av | complete 1 bathroom remodel like for like, no walls or layout change. shower pan.Details
complete 1 bathroom remodel like for like, no walls or layout change. shower pan. | $8,000 |
| Apr 3, 2023 | Completed final sign-off Jul 2023 | 4151 Ulloa St | one complete bathroom remodel- like for like- shower to tub, no wall or layour change. 2nd bathroom adding 2-4 outlets.Details
one complete bathroom remodel- like for like- shower to tub, no wall or layour change. 2nd bathroom adding 2-4 outlets. | $25,000 |
| Feb 10, 2023 | Completed final sign-off Apr 2023 | 1207 Indiana St | one bathroom remodel like for like, no walls or layout changes. replace tub.Details
one bathroom remodel like for like, no walls or layout changes. replace tub. | $25,000 |
| Jan 26, 2023 | Completed final sign-off Jun 2023 | 1739 31st Av | one complete bathroom remodel like for like. new tile, new shower (shower pan), vanity, plumbing fixtures, tub, no walls/layout change. one kitchen remodel like for like, new cabinets, countertop, appliances. runa new subpanel to accomodate work.Details
one complete bathroom remodel like for like. new tile, new shower (shower pan), vanity, plumbing fixtures, tub, no walls/layout change. one kitchen remodel like for like, new cabinets, countertop, appliances. runa new subpanel to accomodate work. | $30,000 |
| Jan 17, 2023 | Completed final sign-off Apr 2024 | 4528 17th St | replace 1220 sf. drywall, 80x68 sliding dr, 300 sf.cement fiber siding, kitchen cabinets, countertops, tub splash in 1st flr bathrm. replace (1) toilet, (1) bath vanity 12 plugs, 6 light outlet, 6 switches, 2 inter doors. recoat 2 decks w/ flastower. replace handwood fl.to comply with nov# 202298635Details
replace 1220 sf. drywall, 80x68 sliding dr, 300 sf.cement fiber siding, kitchen cabinets, countertops, tub splash in 1st flr bathrm. replace (1) toilet, (1) bath vanity 12 plugs, 6 light outlet, 6 switches, 2 inter doors. recoat 2 decks w/ flastower. replace handwood fl.to comply with nov# 202298635 | $300,000 |
| Jan 12, 2023 | In progress issued Jun 2024 | 1206 18th St | horiz. rear addition and interior remodel of all levels to incl: 1st flr: add horiz addition at rear, add stair to rear yard,(n) bdrm + media rm. 2nd flr: construct 2 (n) bathrooms + add 2 (n) bdrms. 3rd flr: expand (e) rear roof deck. relocate kitchen. remodel (e) rooms. 4th flr: add (n) bathroom.Details
horiz. rear addition and interior remodel of all levels to incl: 1st flr: add horiz addition at rear, add stair to rear yard,(n) bdrm + media rm. 2nd flr: construct 2 (n) bathrooms + add 2 (n) bdrms. 3rd flr: expand (e) rear roof deck. relocate kitchen. remodel (e) rooms. 4th flr: add (n) bathroom. | $300,000 |
| Aug 4, 2022 | Never finaled issued Aug 2022, no final | 6 Young Ct | on 2nd floor - one bathroom remodeling, like for like, replace plumbing fixtures, update m/e/p to codes.Details
on 2nd floor - one bathroom remodeling, like for like, replace plumbing fixtures, update m/e/p to codes. | $14,000 |
| Mar 2, 2022 | Completed final sign-off May 2022 | 38 Bryant St | bathroom remodeling like for like p/e/m. kitchen remodeling like for like p/e/m. gfci per code. replace plumbing fixtures (no tub) electric and appliances to be replaced, hood, dw, ref. no wall or layout changes.Details
bathroom remodeling like for like p/e/m. kitchen remodeling like for like p/e/m. gfci per code. replace plumbing fixtures (no tub) electric and appliances to be replaced, hood, dw, ref. no wall or layout changes. | $30,000 |
| Oct 7, 2021 | Never finaled issued Oct 2021, no final | 4366 25th St | remodel guest bathroom, like for like with new tub & plumbing xutrs & elecrrical. remodel master bathroom, like for like, 2 windows u dact .3 mx non-visiable to street with retrofit. new 100a main services, new radiate heated flooring, electrical rewire & car charger 5a ckt.Details
remodel guest bathroom, like for like with new tub & plumbing xutrs & elecrrical. remodel master bathroom, like for like, 2 windows u dact .3 mx non-visiable to street with retrofit. new 100a main services, new radiate heated flooring, electrical rewire & car charger 5a ckt. | $30,000 |
| Sep 22, 2021 | Never finaled issued Oct 2021, no final | 1510 07th Av | rev to pa# 2021-0723-4970: basement remove full bath, 1st fl. convert full bath to half bath by removing standing shower and relocating vainity, full kitchen remodel w/ structural wall removal 2nd fl. like for like replacement of wet bar area including new bar sink fullDetails
rev to pa# 2021-0723-4970: basement remove full bath, 1st fl. convert full bath to half bath by removing standing shower and relocating vainity, full kitchen remodel w/ structural wall removal 2nd fl. like for like replacement of wet bar area including new bar sink full | $23,000 |
| Jul 23, 2021 | Never finaled issued Jul 2021, no final | 1510 07th Av | 15 new lights, new sub, 2 bathrooms like for like, replace plumbing fixtures, kitchen remodling like for like, run new gas line for fireplace, repiair clogged drain for washer, electrical car charger. all new plumbing & electrical fixtures.Details
15 new lights, new sub, 2 bathrooms like for like, replace plumbing fixtures, kitchen remodling like for like, run new gas line for fireplace, repiair clogged drain for washer, electrical car charger. all new plumbing & electrical fixtures. | $35,000 |
| Mar 18, 2021 | Never finaled issued Mar 2021, no final | 329 14th Av | bathroom remodeling. replace all plumbing, fixtures. add 2 recess light, fan replace. add toilet into linen clothet inside bathroom. no walls to be removed. replace sink, shower, 2 gfci.Details
bathroom remodeling. replace all plumbing, fixtures. add 2 recess light, fan replace. add toilet into linen clothet inside bathroom. no walls to be removed. replace sink, shower, 2 gfci. | $16,000 |
| Mar 10, 2021 | Expired or cancelled cancelled Nov 2024 | 2691 20th Av | 7 retrofit windows installation. 2 bathroom remodel, master bath creation. framing work for walls removal. no foundation. kitchen remode, roofing, same framing, new waterproofing. new laundry room.Details
7 retrofit windows installation. 2 bathroom remodel, master bath creation. framing work for walls removal. no foundation. kitchen remode, roofing, same framing, new waterproofing. new laundry room. | $85,000 |
| Nov 9, 2020 | Completed final sign-off Feb 2021 | 1779 32nd Av | full bathroom remodel in-kind, 2/f, replace all fixtures, new fan, (2) lights, double sink vanity, tub. no structural work no wall modificationDetails
full bathroom remodel in-kind, 2/f, replace all fixtures, new fan, (2) lights, double sink vanity, tub. no structural work no wall modification | $10,500 |