A Y Engineering
- Based in
- Oakland
- On San Francisco permits
- May 2010 to Oct 2011
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 4 days from filing to permit and 11 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2011 | Completed final sign-off Sep 2011 | 294 09th Av | replaced dry rot damaged existing exterior winding stair serving 1 residential unit to connect with an existing stair landing serving residential units only, replace in kindDetails
replaced dry rot damaged existing exterior winding stair serving 1 residential unit to connect with an existing stair landing serving residential units only, replace in kind | $2,000 |