Permit GraphShortlistSan Francisco building permits since 2000

A Step Ahead Construction Llc

Contractor license
1072690
State license record
Based in
Oakland
On San Francisco permits
Jan 2018 to Mar 2023
Last 24 months
0 permits filed

5 permits since 2000: 1 completed, 3 never finaled, 1 expired or cancelled.

Of the 3 never-finaled permits, 3 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Bathroom remodel permits

AllStairs 1Kitchen remodel 3Bathroom remodel 4

4 bathroom remodel permits: 1 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 157 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 8, 2023Expired or cancelled
expired May 2026
1569 16th Avadd a new front door at foyer area.reconfig main staircase with pen design.add new bath,closet and mud room on 1/f per plan.remodel (e) kitchen and diing with open design.remodel the (e) living room and (e) bathroom on 2/f conert 1 bedroom into master suite.
Details
Permit
202303083242
Permit issued
Mar 9, 2023

add a new front door at foyer area.reconfig main staircase with pen design.add new bath,closet and mud room on 1/f per plan.remodel (e) kitchen and diing with open design.remodel the (e) living room and (e) bathroom on 2/f conert 1 bedroom into master suite.

Open the permit page

$60,000
Nov 9, 2018Never finaled
issued Apr 2019, no final
416 Capp Stconvert storage space at rear of 1st fl into habitable space to include 1 bedroom, 1 bath, & 1 family rm connected to 2nd fl unit. replace window with tempered glaze @ lightwell on 1st floor.
Details
Permit
201811095525
Permit issued
Apr 8, 2019

convert storage space at rear of 1st fl into habitable space to include 1 bedroom, 1 bath, & 1 family rm connected to 2nd fl unit. replace window with tempered glaze @ lightwell on 1st floor.

Open the permit page

$20,000
Mar 6, 2018Completed
final sign-off Aug 2018
207 Juanita Wyreno (e) bathroom, only replace shower tub, sink, wc, and tiles. replace kitchen cabinets countertops on 2nd flr. sfd
Details
Permit
201803063044
Permit issued
Mar 6, 2018
Final sign-off
Aug 10, 2018

reno (e) bathroom, only replace shower tub, sink, wc, and tiles. replace kitchen cabinets countertops on 2nd flr. sfd

Open the permit page

$8,500
Jan 30, 2018Never finaled
issued Jan 2018, no final
601 Van Ness Avunit 302: replace (e) kitchen countertop & cabiet, replace (e) 2 bathrooms fixtures, 2 bathtubs, 2 lavatory & 2 wc , floor tiles, replace 2 lights on ceiling
Details
Permit
201801309925
Permit issued
Jan 30, 2018

unit 302: replace (e) kitchen countertop & cabiet, replace (e) 2 bathrooms fixtures, 2 bathtubs, 2 lavatory & 2 wc , floor tiles, replace 2 lights on ceiling

Open the permit page

$40,000