A & S Quality Builders Company
- Based in
- So. San Francisco
- On San Francisco permits
- Mar 2009 to Jul 2010
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 14 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2010 | Completed final sign-off Jun 2010 | 3106 Turk Bl | repair dry rot of the deck at rear. repalce one post. replace 9 pieces of joists. replace 2 x 6 on the top of the deck. repair work less than 50%.no structural changes. in kind redwood or pressure treatedDetails
repair dry rot of the deck at rear. repalce one post. replace 9 pieces of joists. replace 2 x 6 on the top of the deck. repair work less than 50%.no structural changes. in kind redwood or pressure treated | $2,500 |