A & S Quality Builders Company
- Based in
- So. San Francisco
- On San Francisco permits
- Mar 2009 to Jul 2010
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 26, 2010 | Completed final sign-off Oct 2010 | 1235 Bay St | unit #11: kitchen and bath remodel. replace cabinets, toilet, sink. keep tubDetails
unit #11: kitchen and bath remodel. replace cabinets, toilet, sink. keep tub | $8,000 |
| Jun 3, 2010 | Completed final sign-off Jun 2010 | 3106 Turk Bl | repair dry rot of the deck at rear. repalce one post. replace 9 pieces of joists. replace 2 x 6 on the top of the deck. repair work less than 50%.no structural changes. in kind redwood or pressure treatedDetails
repair dry rot of the deck at rear. repalce one post. replace 9 pieces of joists. replace 2 x 6 on the top of the deck. repair work less than 50%.no structural changes. in kind redwood or pressure treated | $2,500 |
| May 12, 2010 | Completed final sign-off Oct 2010 | 630 Corbett Av | in kind repair of stucco patch on graystone ter facade, no structural workDetails
in kind repair of stucco patch on graystone ter facade, no structural work | $16,300 |
| Apr 30, 2010 | Completed final sign-off Jul 2010 | 246 Hearst Av | repair rotten framing members, 15 studs, 1 rim joist, add plywood on the deck, less than 50%. add value to pa# 2010-0416-0428Details
repair rotten framing members, 15 studs, 1 rim joist, add plywood on the deck, less than 50%. add value to pa# 2010-0416-0428 | $3,500 |
| Apr 16, 2010 | Completed final sign-off Jul 2010 | 246 Hearst Av | replacement of old siding. taking-off old siding. installation of new one @ sides & rear approx. 2000 sq.ft.Details
replacement of old siding. taking-off old siding. installation of new one @ sides & rear approx. 2000 sq.ft. | $13,000 |
| Apr 16, 2010 | Completed final sign-off May 2010 | 155 Gardenside Dr | replacement of bathtub, remodeling a bathroom, remove (e) bathtub and tile, installation of (n) shower base & tile.Details
replacement of bathtub, remodeling a bathroom, remove (e) bathtub and tile, installation of (n) shower base & tile. | $3,000 |
| Sep 28, 2009 | Completed final sign-off Dec 2009 | 3730 Anza St | repair rotten surface of sheathing and change 3 studs in the front of house. repair stucco.Details
repair rotten surface of sheathing and change 3 studs in the front of house. repair stucco. | $3,000 |
| Apr 15, 2009 | Completed final sign-off Apr 2009 | 2350 Union St | replacement of rotten studs 6 pes (approximate). revision to #200903305159.Details
replacement of rotten studs 6 pes (approximate). revision to #200903305159. | $1,500 |
| Mar 30, 2009 | Completed final sign-off Apr 2009 | 2350 Union St | siding repair and painting side of the bldg. < 100 sq ft. replace & not visible from street. repair in kind.Details
siding repair and painting side of the bldg. < 100 sq ft. replace & not visible from street. repair in kind. | $1,200 |