Back to kitchen remodel contractors
A S A P Expert Plumbing & Construction
- Based in
- Oakland
- On San Francisco permits
- Jun 2014 to Nov 2024
- Last 24 months
- 1 permit filed
10 permits since 2000: 7 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 1 completed, 1 in progress, 1 never finaled. Typically 28 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2024 | In progress issued Dec 2024 | 126 Staples Av | revision to pa 202409191181. 2nd floor relocation of kitchen and bathroom (n) master bedroom and bathroom . removal of walls to be replaced, removal of deck to be replaced with (n) 10ft deck relocation of deck stairs located at the rear.Details
revision to pa 202409191181. 2nd floor relocation of kitchen and bathroom (n) master bedroom and bathroom . removal of walls to be replaced, removal of deck to be replaced with (n) 10ft deck relocation of deck stairs located at the rear. | $95,000 |
| Nov 3, 2021 | Never finaled issued Nov 2021, no final | 44 Bache St | repair front stucco; 1st fl - add family room, 1 bedroom, 1 full bath; 2nd fl - remodel kitchen, bathroom, add roof deck @ rear; attic - add 1 bedroom, 1 full bath; reconfigure interior stairs. replace front windows in-kind.Details
repair front stucco; 1st fl - add family room, 1 bedroom, 1 full bath; 2nd fl - remodel kitchen, bathroom, add roof deck @ rear; attic - add 1 bedroom, 1 full bath; reconfigure interior stairs. replace front windows in-kind. | $110,000 |
| Jun 2, 2014 | Completed final sign-off Dec 2014 | 59 Castillo St | add two bedrooms, one bathroom & mud room on 1st floor per plan. remodel (e) kitchen on 2nd floor per plan. remodel (e) bathroom & (e) bedroom on 3rd floor per plan.Details
add two bedrooms, one bathroom & mud room on 1st floor per plan. remodel (e) kitchen on 2nd floor per plan. remodel (e) bathroom & (e) bedroom on 3rd floor per plan. | $60,000 |