Back to kitchen remodel contractors
A S A P Construction
- Based in
- Oakland
- On San Francisco permits
- Oct 2016 to Aug 2024
- Last 24 months
- 0 permits filed
40 permits since 2000: 36 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 in progress. Typically 0 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 1, 2024 | In progress issued Aug 2024 | 104 Wool St | one kitchen remodel on first floor. replacing cabinets.Details
one kitchen remodel on first floor. replacing cabinets. | $15,000 |
| Feb 24, 2021 | Completed final sign-off Jun 2021 | 349 Ellington Av | remodel kitchen in-kind. replace cabinet, sheetrock, electrical, plumbing, insulkation, floors & paint. and install new sheetrock & electrical in the bathroom. not removal of walls or make any new openings.Details
remodel kitchen in-kind. replace cabinet, sheetrock, electrical, plumbing, insulkation, floors & paint. and install new sheetrock & electrical in the bathroom. not removal of walls or make any new openings. | $47,500 |
| Dec 31, 2020 | Completed final sign-off Feb 2023 | 830 Alabama St | unit remodel. no square footage added. remodel layout of kitchen, see also pa 201901180754 for approvals.Details
unit remodel. no square footage added. remodel layout of kitchen, see also pa 201901180754 for approvals. | $120,000 |
| Aug 29, 2019 | Completed final sign-off Jun 2020 | 350 College Av | kitchen remodel including modified layout, new finishes, fixtures, and appliancesDetails
kitchen remodel including modified layout, new finishes, fixtures, and appliances | $15,000 |
| Feb 14, 2019 | Completed final sign-off Mar 2019 | 406 College Av | fully remodel kitchen. 10' x 14'Details
fully remodel kitchen. 10' x 14' | $18,000 |
| Mar 28, 2018 | Completed final sign-off May 2018 | 671 London St | kitchen remodel upgrade electrical pain and replace countertopDetails
kitchen remodel upgrade electrical pain and replace countertop | |
| Feb 22, 2018 | Completed final sign-off Jun 2018 | 136 Murray St | repair water damage in kitchen. replace cabinets, install new sink and dishwasher. replace finish floor, paint and upgrade the electrical wiring in the kitchen.Details
repair water damage in kitchen. replace cabinets, install new sink and dishwasher. replace finish floor, paint and upgrade the electrical wiring in the kitchen. | $14,000 |
| Aug 10, 2017 | Completed final sign-off Feb 2019 | 723 York St | horizontal addition @ rear (2-stories). renovate kitchen & bathrooms. finish out portion of unfinished garage @ lower level.Details
horizontal addition @ rear (2-stories). renovate kitchen & bathrooms. finish out portion of unfinished garage @ lower level. | $400,000 |