Permit GraphShortlistSan Francisco building permits since 2000

A R C Dba/ Architectural Coatings

Contractor license
918452
State license record
Based in
San Rafael
On San Francisco permits
Jun 2009 to Aug 2025
Last 24 months
5 permits filed

55 permits since 2000: 26 completed, 2 in progress, 20 never finaled, 7 expired or cancelled.

Of the 20 never-finaled permits, 6 are 3 to 5 years old, 1 is 5 to 10 years old, 13 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllDeck 4Stairs 6Bathroom remodel 1

6 stairs permits: 4 completed, 2 never finaled. Typically 0 days from filing to permit and 90 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 27, 2024Completed
final sign-off May 2025
2515 34th Avremove tile waterproof stairs, replace new tile (front of house)
Details
Permit
202412277470
Status
complete
Filed
Dec 27, 2024
Permit issued
Dec 27, 2024
Final sign-off
May 22, 2025
Declared cost
$25,000
Address
2515 34th Av

remove tile waterproof stairs, replace new tile (front of house)

Open the permit page

$25,000
Apr 26, 2022Never finaled
issued Apr 2022, no final
2270 29th Avrev to pa# 2022-0301-8940: demolish the (e) tile & concrete stairs including stucco at sides of stairs, replace any dry rot wood with new wood, apply waterproof membrane & install tile, repair loakage at stairs (more than 50%)
Details
Permit
202204263034
Status
issued
Filed
Apr 26, 2022
Permit issued
Apr 27, 2022
Declared cost
$14,400
Address
2270 29th Av

rev to pa# 2022-0301-8940: demolish the (e) tile & concrete stairs including stucco at sides of stairs, replace any dry rot wood with new wood, apply waterproof membrane & install tile, repair loakage at stairs (more than 50%)

Open the permit page

$14,400
Feb 4, 2022Completed
final sign-off Mar 2022
2855 Jackson Strepair dry rot wood damage at stair structure & siding wall. less than 50% repair
Details
Permit
202202047330
Status
complete
Filed
Feb 4, 2022
Permit issued
Feb 4, 2022
Final sign-off
Mar 23, 2022
Declared cost
$10,194
Address
2855 Jackson St

repair dry rot wood damage at stair structure & siding wall. less than 50% repair

Open the permit page

$10,194
Dec 30, 2011Never finaled
issued Dec 2011, no final
2501 28th Avremove brick and dryrot wood at stairs and restore stairs with new wood, flashing, waterproof membrane mortar bed and tile
Details
Permit
201112301520
Status
issued
Filed
Dec 30, 2011
Permit issued
Dec 30, 2011
Declared cost
$21,000
Address
2501 28th Av

remove brick and dryrot wood at stairs and restore stairs with new wood, flashing, waterproof membrane mortar bed and tile

Open the permit page

$21,000
Jan 6, 2011Completed
final sign-off Feb 2011
1970 15th Strevision to pa# 2010.10.13.2928. repair rear stairs 99%, not total replacement. in kind replacement.
Details
Permit
201101068008
Status
complete
Filed
Jan 6, 2011
Permit issued
Jan 11, 2011
Final sign-off
Feb 24, 2011
Declared cost
$5,363
Address
1970 15th St

revision to pa# 2010.10.13.2928. repair rear stairs 99%, not total replacement. in kind replacement.

Open the permit page

$5,363
Oct 13, 2010Completed
final sign-off Feb 2011
1970 15th Strepair dry rot at rear stair structure at joists, stair stringers, posts, rails, treads and landings, repair area less than 50% in-kind. maintain functional use of stair while work is in progress
Details
Permit
201010132928
Status
complete
Filed
Oct 13, 2010
Permit issued
Oct 13, 2010
Final sign-off
Feb 24, 2011
Declared cost
$14,900
Address
1970 15th St

repair dry rot at rear stair structure at joists, stair stringers, posts, rails, treads and landings, repair area less than 50% in-kind. maintain functional use of stair while work is in progress

Open the permit page

$14,900