Back to kitchen remodel contractors
A M G Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2010 to Aug 2011
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 2 never finaled. Typically 0 days from filing to permit and 97 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2011 | Completed final sign-off May 2011 | 237 Jersey St | work on #237 only - install kitchen cabinets, upgrade electrical and plumbing at kitchen, add 3 new electrical outlets at 3 other rooms, patch and repair as necessary.Details
work on #237 only - install kitchen cabinets, upgrade electrical and plumbing at kitchen, add 3 new electrical outlets at 3 other rooms, patch and repair as necessary. | $9,000 |
| Dec 16, 2010 | Never finaled issued Feb 2011, no final | 930 Pierce St | replace kitchen ,breakfast and lounge cabinets.replace and add light fixture. replace plumbing fixtures. replace kitchen appliances. add light switches and receptacles.Details
replace kitchen ,breakfast and lounge cabinets.replace and add light fixture. replace plumbing fixtures. replace kitchen appliances. add light switches and receptacles. | $50,000 |
| Nov 5, 2010 | Never finaled issued Nov 2010, no final | 1907 Leavenworth St | unit #2:plumbing from kitchen sink to washing machine will run trhough window well. move baseboard heater from under built-in to under window. will extend power and control wires. electric heater to be existing to remain relocation only: dryer exhaust to terminate min 3' fr. propertyline & bldg.Details
unit #2:plumbing from kitchen sink to washing machine will run trhough window well. move baseboard heater from under built-in to under window. will extend power and control wires. electric heater to be existing to remain relocation only: dryer exhaust to terminate min 3' fr. propertyline & bldg. | $6,636 |
| Jun 1, 2010 | Completed final sign-off Sep 2010 | 235 Jersey St | kitchen: new cabinets & appliances & upgrade electrical. (n) countertop & sink & faucet. (n) vinyl floors throughout: patch & paint, general repairs, re-finish wood flrs. some minor electrical work. bath replace shower head & paint.Details
kitchen: new cabinets & appliances & upgrade electrical. (n) countertop & sink & faucet. (n) vinyl floors throughout: patch & paint, general repairs, re-finish wood flrs. some minor electrical work. bath replace shower head & paint. | $23,000 |
| Apr 29, 2010 | Completed final sign-off Aug 2010 | 250 King St | (n) wood flooring & tile throughout. (n) appliances at kitchen. (n) toilet & vanity & sink @ bath. paint, some (n) lighting fixtures. (n) tile @ kitchen floor & bath floor & shower.Details
(n) wood flooring & tile throughout. (n) appliances at kitchen. (n) toilet & vanity & sink @ bath. paint, some (n) lighting fixtures. (n) tile @ kitchen floor & bath floor & shower. | $22,500 |