Back to bathroom remodel contractors
A J Construction
- Based in
- Daly City
- On San Francisco permits
- Jul 2008 to May 2024
- Last 24 months
- 0 permits filed
16 permits since 2000: 5 completed, 4 never finaled, 7 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
8 bathroom remodel permits: 2 completed, 3 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 10, 2024 | Completed final sign-off Dec 2024 | 142 Oxford St | limited demo work at 2nd floor of the (e) house. converting (e) bedroom 3 to a new office. adding a new toilet to (e)( bedroom 2. converting portion of (e) bedroom 3 to a new bathroom and closets. remocel (e) kitchen with new wall.Details
limited demo work at 2nd floor of the (e) house. converting (e) bedroom 3 to a new office. adding a new toilet to (e)( bedroom 2. converting portion of (e) bedroom 3 to a new bathroom and closets. remocel (e) kitchen with new wall. | $80,000 |
| Jun 19, 2019 | Never finaled filed Jun 2019, never issued | 232 Talbert St | remove connecting stairs from upper unit to garage to comply with nov 201803671. install 1 hr wall on lower level, remove 1 window (bathroom)Details
remove connecting stairs from upper unit to garage to comply with nov 201803671. install 1 hr wall on lower level, remove 1 window (bathroom) | $4,000 |
| Oct 18, 2018 | Never finaled issued Oct 2018, no final | 232 Talbert St | remove existing 2 temporary main panles and replace with 2 main meters. reframe mounting structure for panels, re-pipe water supply for upper toilet. re-patch wall inside bathroom as effected by re-piping to comply with nov 201891401 #2Details
remove existing 2 temporary main panles and replace with 2 main meters. reframe mounting structure for panels, re-pipe water supply for upper toilet. re-patch wall inside bathroom as effected by re-piping to comply with nov 201891401 #2 | $3,500 |
| Oct 11, 2018 | Never finaled issued Oct 2018, no final | 64 Delano Av | install 1 subpanel, frame soffit, relocae copper pipes obstructing new lines for subpanel, patch area to match at (e) bathroomDetails
install 1 subpanel, frame soffit, relocae copper pipes obstructing new lines for subpanel, patch area to match at (e) bathroom | $1,500 |
| Dec 31, 2008 | Completed final sign-off Apr 2009 | 127 Julian Av | kitchen remodel, 1 bathroom remodel, new gas lines, electric upgrade, no structural changes.Details
kitchen remodel, 1 bathroom remodel, new gas lines, electric upgrade, no structural changes. | $18,000 |
| Dec 5, 2008 | Expired or cancelled expired Sep 2009 | 207 Marietta Dr | revision to application 200808229825. altered wall location for bath & closet & other bath fixtures.Details
revision to application 200808229825. altered wall location for bath & closet & other bath fixtures. | |
| Aug 29, 2008 | Expired or cancelled expired Apr 2010 | 125 Julian Av | bathroom and kitchen remodel on g/f. repair back stairway leading to carport (less than 50%) and replace in kind materials. replace (e) garage door with new overhead wood panel and electric garage door opener.Details
bathroom and kitchen remodel on g/f. repair back stairway leading to carport (less than 50%) and replace in kind materials. replace (e) garage door with new overhead wood panel and electric garage door opener. | $15,000 |
| Aug 22, 2008 | Expired or cancelled expired Sep 2009 | 207 Marietta Dr | convert a portion of ex.garage into 1 study rm, 1 closet and 1 bath, 2 new skylights & replace 2 existing skylights.Details
convert a portion of ex.garage into 1 study rm, 1 closet and 1 bath, 2 new skylights & replace 2 existing skylights. | $10,000 |