A G Renovation & Improvements
- Based in
- Stockton
- On San Francisco permits
- Oct 2019 to Aug 2021
- Last 24 months
- 0 permits filed
7 permits since 2000: 1 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 71 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 9, 2021 | Completed final sign-off Jan 2022 | 23 Annapolis Tr | work to be performed, removal of (e) convenience stair between garage and 2nd floor, removal of sheet rock framing, electrical, sheetrock painting to install new 1 hr. rated elevator shaft. residential elevator to be installed under separate permit.Details
work to be performed, removal of (e) convenience stair between garage and 2nd floor, removal of sheet rock framing, electrical, sheetrock painting to install new 1 hr. rated elevator shaft. residential elevator to be installed under separate permit. | $25,000 |